My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />Simplified Interconnection Application <br />Persons interested in applying for the interconnection of a distributed energy resource (DER) to the <br /> through the Simplified Process are to fill out this Simplified Interconnection <br />Application. The Simplified Interconnection Application is to be used for inverter-based DER <br />technologies with the capacity of 20 kW AC or less and is to be filled out completely by the Applicant. <br />The Simplified Application shall be returned to the Utility with the requested material information and a <br />non-refundable $100 application fee. <br />Proposed DER interconnections <br />be moved into the Fast Track Process if engineering screens are failed during the Simplified <br />Interconnection Application review. Timeline for review of the Simplified Application is as follows: <br />Upon receipt of a Simplified Interconnection Application the Utility has 10 business days to <br />review the application for completeness. <br />If the application is deemed incomplete, the Utility shall notify the Applicant of what additional <br />information material is required. <br />The Applicant has 5 business days to return the missing information material or their application <br />may lose its queue position and be deemed withdrawn. <br />The Utility shall have a total of 20 business days to review the Simplified Interconnection <br />Application, not including time waiting for additional information material to deem the <br />application completed. <br />The Utility will notify the Application if the proposed DER system is preliminary approved for <br />interconnection or if the proposed DER system will need to be moved in the Fast Track Process. <br />Checklist for Submission to Utility <br />The items below shall be included with submittal of the Simplified Application to the Utility. Failure to <br />include all items will deem the Simplified Application incomplete. <br />Included <br />$100 Non-Refundable Simplified Application Fee Yes <br />One-line diagram Details required on one-line diagram specified at the end of <br /> Yes <br />the interconnection application. <br />All Certified Equipment Manufacturer Specification Sheets Yes <br />Site Layout Drawing Yes <br />Copy of Insurance Declaration page or other acceptable proof of insurance Yes <br />Possible Additional Documentation <br />If an Application Agent is being used for this project, the Site Layout Drawing must be signed <br />by the Interconnection Customer indicating Site Control of the DER interconnection location. <br />If the DER export capacity is limited, include information material explaining the limiting <br />capabilities. <br />If Energy Storage is included with the proposed DER system include the Energy Storage <br />Application. <br />ELK RIVER MUNICIPAL UTILITIES <br />233 <br />