Laserfiche WebLink
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />11.8.Continual Compliance <br />The Interconnection Customer shall operate its DER system in compliance with the Area <br />referred to in the executed Interconnection <br />Agreement. The Area EPS Operator may periodically inspect, at its own expense, the <br />operation of DER system as it relates to power quality, thermal limits and reliability. <br />Failure by the Interconnection Customer to remain in compliance with the technical <br />requirements will result in the disconnection of the DER system from the Area EPS <br />Distribution System. <br /> <br />11.9.Disconnection of DER <br />The Area EPS Operator has the right to disconnect the DER in the event of the <br />following: <br />Does not continue to follow and maintain IEEE 1547 settings approved by the Area <br />EPS Operator as indicated by the adopted technical requirements. <br /> <br />Does not meet all the requirements of the Study Process. <br /> <br />Uniform Contract. <br /> <br />The Area EPS Operator may temporarily disconnect the DER upon the following <br />conditions: <br />For scheduled outages upon reasonable notice. <br /> <br />For unscheduled outages or emergency conditions. <br /> <br />If the DER does not operate in the manner consistent with the Study Process. <br /> <br />The Area EPS Operator shall inform the Interconnection Customer in advance of any <br />scheduled disconnections, or as reasonable, after an unscheduled disconnection. <br /> <br /> <br /> <br />17 <br /> <br />228 <br />