My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />Pre-Application Report Request <br />Persons interested in finding out the additional information regarding the interconnection of a <br />-Application Report <br />Request. The pre-application report request is to be filled out as completely as possible by the <br />applicant. The Utility will provide the applicant with a Pre-Application Report within 15 business days <br />once the completed Pre-Application Report Request and a $300 fee is submitted to the Utility. <br />Distributed Energy Resource Information <br />Project Address: <br />City: State: Zip Code: <br />GPS Coordinates: Nearby Cross Streets: <br />Location of the Proposed Point of Common Coupling (e.g. meter number or pole number): <br />DER Type (Check all that apply): <br /> Solar Photovoltaic Wind Battery Storage <br /> Combined Heat and Power Solar Thermal Other (please specify) <br />Total Aggregate Nameplate Rating of Proposed DER System (kW AC): <br />Phase Configuration of Proposed DER System Single Three <br />Service Voltage of Proposed DER System Volts <br />Will this be a stand-alone generator not interconnected to onsite load <br /> Yes No <br />(not including station service)? <br /> <br />Please attach copy of site map for proposed project and any additional information that may be helpful <br />in fulfilling the pre-application request. Site map should include true north, proposed project location <br />including general layout, proposed service point location and major roadways. <br /> <br />For Office Use Only <br />Date Received: Application Fee Received: Yes No <br />Date Completed Pre-Application Report Sent to Applicant: <br />ELK RIVER MUNICIPAL UTILITIES 1 <br /> <br />229 <br />
The URL can be used to link to this page
Your browser does not support the video tag.