Laserfiche WebLink
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />portion of the Area EPS <br />Interconnection Customer shall provide the Area EPS Operator, at the Interconnection <br />y, letter of credit or other form of security that is <br />reasonably acceptable to the Area EPS Operator and is consistent with the Minnesota <br />Uniform Commercial Code. Such security for payment shall be in an amount sufficient to <br />cover the costs for constructing, designing, procuring, and installing the applicable <br />portion of the Area EPS Operator <br />reduced on a dollar-for-dollar basis for payments made to the Area EPS Operator under <br />the Interconnection Agreement during its term. <br /> <br />The guaranty must be made by an entity that meets the creditworthiness requirements <br />of the Area EPS Operator and contain terms and conditions that guarantee payment of <br />any amount that may be due from the Interconnection Customer, up to an agreed-to <br />maximum amount. <br /> <br />The letter of credit must be issued by a financial institution or insurer reasonably <br />acceptable to the Area EPS Operator and must specify a reasonable expiration date not <br />sooner than sixty (60) Business Days, (three calendar months), after the due date of the <br />final accounting report and invoice described in Section 11.4. <br /> <br />11.6.Non-Warranty <br />Area EPS Operator does not give any warranty, expressed or implied, as to the <br />adequacy, safety, or other characteristics of any structures, equipment, wires, <br />appliances or devices owned, operated, installed or maintained by the Interconnection <br />Customer, including without limitation the DER and any structures, equipment, wires, <br />appliances or devices not owned, operated or maintained by the Area EPS Operator. The <br />Area EPS Operator does not guarantee uninterrupted power supply to the DER and will <br />operate the Distribution System with the same reliability standards for the entire <br />customer base. <br /> <br />11.7.Authorization for Parallel Operation <br />The Interconnection Customer shall not operate its DER system in parallel with the Area <br />Distribution System without prior written authorization from the Area <br />EPS Operator. The Area EPS Operator shall provide such authorization within three (3) <br />Business Days from when the Area EPS Operator receives notification that the <br />Interconnection Customer has complied with all applicable parallel operations <br />requirements and commissioning has been successfully completed. Such authorization <br />shall not be unreasonably withheld, conditioned or delayed. <br />16 <br /> <br />227 <br />