Laserfiche WebLink
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />Conditional Use Permit(s) may be provided to the Area EPS Operator, with the <br />confidential information being clearly marked and subjected to Confidentiality <br />provisions in the Overview Process document Section 12.1. <br /> <br />The Area EPS Operator may contract with consultants to perform activities required <br />under the Facilities Study Agreement. The Interconnection Customer and the Area EPS <br />Operator may agree to allow the Interconnection Customer to separately arrange for <br />the design of some of the Interconnection Facilities. In such cases, facilities design will <br />be reviewed and/or modified prior to acceptance by the Area EPS Operator, under the <br />provisions of the Facilities Study Agreement. The Area EPS Operator shall make <br />sufficient information available to the Interconnection Customer, in accordance with <br />confidentiality and critical infrastructure requirements, to permit the Interconnection <br />Customer to obtain an independent design and cost estimate for any necessary <br />facilities. <br /> <br />6.5.Facilities Study Report Timeline <br />In cases where Upgrades are required, the Facilities Study must be completed within <br />forty-five (45) Business Days of the receipt of the executed Facilities Study Agreement <br />and deposit. In cases where no Upgrades are necessary, and the required facilities are <br />limited to Interconnection Facilities, the Facilities Study must be completed within thirty <br />(30) Business Days of the receipt of the executed Facilities Study Agreement and <br />deposit. <br /> <br />Once the Facilities Study is completed, a draft Facilities Study Report shall be prepared <br />and transmitted to the Interconnection Customer. Upon request, the Area EPS Operator <br />shall provide the Interconnection Customer supporting documentation developed in the <br />preparation of the Interconnection Facilities Study, subject to confidentiality <br />arrangements consistent with these procedures and the Facilities Study Agreement. <br /> <br />Within ten (10) Business Days of providing a draft Facilities Study Report to the <br />Interconnection Customer, the Area EPS Operator and Interconnection Customer shall <br />meet to discuss the results of the Facilities Study. This meeting may be omitted by <br />mutual agreement. The Interconnection Customer may, within twenty (20) Business <br />Days after receipt of the draft report, provide written comments to the Area EPS <br />Operator, which the Area EPS Operator shall address in the final report. <br /> <br />The Area EPS Operator shall issue the final Facilities Study Report within fifteen (15) <br />Business Days of receiving the Interconnection Customer, or promptly upon <br />receiving the they will not provide <br />comments. The Area EPS Operator may reasonably extend the time frame, upon notice <br />8 <br /> <br />219 <br />