My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />to the Interconnection Customer, if the Interconnection Custome <br />additional analyses or lead to significant modifications by the Area EPS Operator prior to <br />issuance of the final Facilities Study Report. <br /> <br />7Interconnection Agreement <br />7.1.Uniform Contract <br />For a proposed interconnection that meets the conditions of being classified as a <br />qualifying facility less than 40 kW, the Area EPS Operator shall provide the <br />Contract for Cogeneration and Small Power Production Facilities (Uniform Contract), <br />within five (5) Business Days after the completion of the applicable study(-ies). <br /> <br />7.2.Municipal Minnesota Interconnection Agreement <br />For proposed interconnections that do not meet the conditions of being classified as a <br />qualifying facility less than 40 kW or if requested by the Interconnection Customer in <br />lieu of signing the Uniform Contract, the Area EPS Operator shall provide the <br />Interconnection Customer an executable Municipal Minnesota Interconnection <br />Agreement (MMIA) within five (5) Business Days after the completion of the applicable <br />study(-ies). <br /> <br />7.3.Completion of Agreement <br />The Interconnection Customer must return a signed Interconnection Agreement at least <br />thirty (30) Business Days prior to the requested in-service date of the propose DER. The <br />Area EPS Operator shall sign and return a copy of the fully executed Interconnection <br />Agreement, back to the Interconnection Customer. <br /> <br />The Interconnection Customer may update the requested in-service date submitted on <br />the Interconnection Application to a date thirty (30) Business Days or later from the <br />date on which the Interconnection Customer submits a signed Interconnection <br />Agreement and payment if required unless the Area EPS Operator agrees to an earlier <br />date. <br /> <br />Upon receipt of the signed Interconnection Agreement, the Area EPS Operator may <br />schedule appropriate metering replacements and construction of facilities, if necessary. <br /> <br />9 <br /> <br />220 <br />
The URL can be used to link to this page
Your browser does not support the video tag.