My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />System Impact Study, <br />or <br /> <br />in tandem with a Transmission System Impact Study, or <br /> <br />if no System Impact Study is required, within five (5) Business Days after the scoping <br />meeting, or <br /> <br />within ten (10) Business Days after the Interconnection Application is deemed <br />complete and approved through the Simplified Process or Fast Track Process. <br /> <br />The Facilities Study Agreement shall be accompanied by an outline of the scope of the <br />study and a non-binding good faith estimate of the cost to perform the Facilities Study. <br />The scope of and cost responsibilities for the Facilities Study are to be described in the <br />Facilities Study Agreement. A deposit of the good faith estimated costs for the Facilities <br />Study shall be provided by the Interconnection Customer at the time it returns the <br />Facilities Study Agreement. <br /> <br />6.3.Facilities Study Timeline <br />In order to remain under consideration for interconnection, the Interconnection <br />Customer must return the executed Facilities Study Agreement and pay the required <br />study deposit within fifteen (15) Business Days. <br /> <br />6.4.Identification of Construction of Facilities <br />The Facilities Study shall specify and estimate the cost of the equipment, engineering, <br />procurement and construction work (including overheads), needed to implement the <br />conclusions of the System Impact Study(-ies). Design for any required Interconnection <br />Facilities and/or Upgrades shall be performed under the Facilities Study Agreement <br />unless the Facilities Study Agreement was deemed unnecessary by the Area EPS <br />Operator. However, in the event that the Interconnection Customer did not provide the <br />Area EPS Operator all required Conditional Use Permits at the time of entering into the <br />Facilities Study Agreement, any such Design and/or Upgrades by the Area EPS Operator <br />may be delayed until after the Interconnection Customer has provided to the Area EPS <br />Operator all required Conditional Use Permits or provides a final design. The <br />information in the Conditional Use Permits, or changes to the design, may result in <br />significant modifications to the planned design and/or Upgrades. The Interconnection <br />Customer may send to the Area EPS Operator a redacted version of the Conditional Use <br />Permit(s) to ensure confidentiality, but any and all information that the Area EPS <br />Operator would reasonably need to perform an accurate Facilities Study shall not be <br />redacted. If necessary to comply with these requirements, a confidential version of the <br />7 <br /> <br />218 <br />
The URL can be used to link to this page
Your browser does not support the video tag.