My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />Uniform Contract <br />Production Facilities (Uniform Contract) that may be applied to all qualifying new and existing <br />interconnections between the Area EPS Operator and a DER system having capacity less than <br />40 kilowatts. <br />Upgrades <br />or Distribution System at or beyond the Point of Interconnection. Upgrades may be Network <br />Upgrades or Distribution Upgrades. Upgrades do not include Interconnection Facilities. <br />24 <br /> <br />168 <br />
The URL can be used to link to this page
Your browser does not support the video tag.