Laserfiche WebLink
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />Uniform Contract <br />Production Facilities (Uniform Contract) that may be applied to all qualifying new and existing <br />interconnections between the Area EPS Operator and a DER system having capacity less than <br />40 kilowatts. <br />Upgrades <br />or Distribution System at or beyond the Point of Interconnection. Upgrades may be Network <br />Upgrades or Distribution Upgrades. Upgrades do not include Interconnection Facilities. <br />24 <br /> <br />168 <br />