My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />14Certification of DER Equipment <br />Distributed Energy Resource (DER) equipment proposed for use in an interconnection system <br />shall be considered certified for interconnected operation if the following criteria is met: <br /> <br />1)It has been tested in accordance with industry standards for continuous utility <br />interactive operation in compliance with the appropriate codes and standards <br />referenced below by any Nationally Recognized Testing Laboratory (NRTL) recognized by <br />the United States Occupational Safety and Health Administration to test and certify <br />interconnection equipment pursuant to the relevant codes and standards listed in the <br />Overview Process, <br /> <br />2)It has been labeled and is publicly listed by such NRTL at the time of the interconnection <br />application, and <br /> <br />3)Such NRTL makes readily available for verification all test standards and procedures it <br />utilized in performing such equipment certification, and, with consumer approval, the <br />test data itself. The NRTL may make such information available on its website and by <br />accompanying the equipment. <br /> <br />The Interconnection Customer must verify that the assembly and use of the equipment falls <br />within the use or uses for which the equipment was tested, labeled, and listed by the NRTL. <br /> <br />Certified equipment shall not require further type-test review, testing, or additional equipment <br />to meet the requirements of this interconnection procedure; however, nothing herein shall <br />preclude the need for a DER Design Evaluation or an on-site commissioning test by the parties <br />to the interconnection as provided for in the Minnesota Technical Requirements. <br /> <br />If the certified equipment package includes only interface components (switchgear, inverters, <br />or other interface devices), then an Interconnection Customer must show that the generator or <br />other electric source being utilized with the equipment package is compatible with the <br />equipment package and is consistent with the testing and listing specified for this type of <br />interconnection equipment. <br /> <br />Provided the generator or electric source, when combined with the equipment package, is <br />within the range of capabilities for which it was tested by the NRTL and does not violate the <br />in-test review, <br />testing or additional equipment on the customer side of the Point of Common Coupling shall be <br />required to be considered certified for the purposes of this interconnection procedure; <br />however, nothing herein shall preclude the need for a DER design evaluation or an on-site <br />25 <br /> <br />169 <br />
The URL can be used to link to this page
Your browser does not support the video tag.