SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />Point of DER Connection (PoC) When identified as the Reference Point of Applicability, the <br />point where an individual DER is electrically connected in a Local EPS and meets the <br />requirements of this standard exclusive of any load present in the respective part of the Local <br />EPS (e.g. terminals of the inverter when no supplemental DER device is required). For DER <br />unit(s) that are not self-sufficient to meet the requirements without a supplemental DER <br />device(s), the Point of DER Connection is the point where the requirements of this standard are <br />met by DER in conjunction with a supplemental DER device(s) exclusive of any load present in <br />the respective part of the Local EPS. <br />Queue Position The order of a valid Interconnection Application, relative to all other pending <br />valid Interconnection Applications, that is established based upon the date- and time- of receipt <br />of the complete Interconnection Application as described in Section 4.7. <br />Reasonable Efforts With respect to an action required to be attempted or taken by a Party <br />under these procedures, efforts that are timely and consistent with Good Utility Practice and <br />are otherwise substantially equivalent to those a Party would use to protect its own interests. <br />Reference Point of Applicability The location, either the Point of Common Coupling or the <br />Point of DER Connection, where the interconnection and interoperability performance <br />requirements specified in IEEE 1547 apply. With mutual agreement, the Area EPS Operator and <br />Customer may determine a point between the Point of Common Coupling and Point of DER <br />Connection. See Minnesota Technical Requirements for more information. <br />Simplified Process The procedure for evaluating an Interconnection Application for a certified <br />inverter-based DER no larger than 20 kW that uses the screens described in the Interconnection <br />Process Simplified Process document. The Simplified Process includes simplified procedures. <br />Study Process The procedure for evaluating an Interconnection Application that includes the <br />scoping meeting, system impact study, and facilities study. <br />Transmission Owner The entity that owns, leases or otherwise possesses an interest in the <br />portion of the Transmission System relevant to the Interconnection. <br />Transmission Provider The entity (or its designated agent) that owns, leases, controls, or <br />operates transmission facilities used for the transmission of electricity. The term Transmission <br />Provider includes the Transmission Owner when the Transmission Owner is separate from the <br />Transmission Provider. The Transmission Provider may include the Independent System <br />Operator or Regional Transmission Operator. <br />Transmission System The facilities owned, leased, controlled or operated by the Transmission <br />Provider or the Transmission Owner that are used to provide transmission service. See the <br />Transmission from Generation and Distribution Assets in Docket No. E-999/CI-99-1261. <br />23 <br /> <br />167 <br />