My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />limited thought use of control systems, power relays or similar device settings or adjustments <br />as identified in IEEE 1547. The nameplate ratings referenced in the Interconnection Process are <br />alternating current nameplate DER ratings at the Point of DER Coupling. <br />Network Upgrades Additions, modifications, and upgrades to the Transmission System <br />Network Upgrades do not include Distribution Upgrades. <br />Operating Requirements Any operating and technical requirements that may be applicable <br />Requirements, including those set forth in the Interconnection Agreement. <br />Party or Parties The Area EPS Operator and the Interconnection Customer. <br />Point of Common Coupling (PCC) The point where the Interconnection Facilities connect with <br />po <br />the National Electrical Safety Code. <br /> <br />Figure 1: Point of Common Coupling and Point of DER Connection (Source: IEEE 1547) <br />22 <br /> <br />166 <br />
The URL can be used to link to this page
Your browser does not support the video tag.