My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.7. SR 08-19-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
08-19-2019
>
4.7. SR 08-19-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2019 3:32:57 PM
Creation date
8/15/2019 3:26:13 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Cut the adjacent asphalt surface prior to the Construction of the bituminous surface course to obtain a <br /> clean,vertical,solid edge. <br /> G. Compaction of the aggregate base courses shall be by the Quality Compaction Method. <br /> H. The bituminous tack coat shall be applied at the rate of 0.08 gallons per square yard. <br /> I. The contact surfaces of all fixed structures,the edge of the in-place mixture in all courses at transverse <br /> joints,and the wearing course at longitudinal joints shall be given a uniform coating of Liquid Asphalt or <br /> Emulsified Asphalt before placing the adjoining mixture. The bituminous material shall be applied by <br /> methods that will ensure uniform coating and in no case shall the application be excessive. <br /> J. The bituminous surfacing shall be constructed with maximum deviation of plus or minus%-inch from the <br /> planned compacted thickness. <br /> K. Compaction of all bituminous mixtures shall be by the Ordinary Compaction Method. A nuclear density <br /> meter and operator shall be provided by the Contractor, if requested by the Engineer. <br /> 3.2 FIELD QUALITY CONTROL <br /> A. The bituminous mix shall be designed using Contractor Trial Mix Designs. A current MnDOT mix design may <br /> be accepted provided it represents the aggregate source and bituminous plant being used for the project, <br /> and is approved by the Engineer. No bituminous mixture shall be placed without an approved mix design. <br /> B. Final line and grade of the wearing surface shall not exceed the following tolerances from the adjacent <br /> pavement surfaces: <br /> Distance Below Adjacent <br /> Bituminous Pavement <br /> (inch) <br /> City Streets 1/8 <br /> County Highways 1/8 <br /> State Highways 1/8 <br /> Sidewalks 1/8 <br /> Parking Areas 1/4 <br /> ****END OF SECTION**** <br /> City of Elk River-R13.119052 BITUMINOUS PATCH <br /> August 2019 PAGE 02741-3 <br /> V122617©Bolton&Menk,Inc.2019,All Rights Reserved <br />
The URL can be used to link to this page
Your browser does not support the video tag.