My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.7. SR 08-19-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
08-19-2019
>
4.7. SR 08-19-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2019 3:32:57 PM
Creation date
8/15/2019 3:26:13 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01310-COORDINATION <br /> PART 1-- GENERAL <br /> 1.1 SEQUENCE OF CONSTRUCTION <br /> A. A written project management scheduling tool (i.e.,critical path (CPM),detailed bar chart,etc.)shall be <br /> employed by the Contractor for cost value reporting, planning and scheduling of all work required under <br /> the Contract Documents. This schedule shall show the order in which the Contractor proposes to execute <br /> the work with dates on which it proposes to start the various phases of the work and the estimated <br /> completion date of each phase.The Contractor shall submit a preliminary version of its intended schedule <br /> within 10 working days following the Notice of Award on the attached form or on a form of its own <br /> choosing. The Contractor is required to show the initial critical path(CPM)of tasks to be performed. <br /> B. Unless otherwise approved by the Engineer,the schedule shall also include an anticipated payment <br /> schedule for the volume of work to be completed each month.This schedule shall indicate the Contractor's <br /> intention and ability to complete the work within the contract times,as specified in Article 4 of Section <br /> 00520"Agreement"of this Project Manual. <br /> C. The Preconstruction Conference as outlined in Section 01315"Project Meetings"of this Project Manual will <br /> not be conducted until the schedule is submitted. In addition, no construction staking shall be provided <br /> until the schedule is submitted by the Contractor and reviewed by the Engineer. <br /> 1.2 WORKING HOURS <br /> A. Except in connection with safety or emergency situations,all work at the site shall be performed between <br /> the hours of 7:00 a.m.and 7:00 p.m. Monday through Friday,and 8:00 a.m.and 5:00 p.m.Saturday. No <br /> work shall be performed on Sunday. <br /> B. The Contractor shall notify the Owner and Engineer of any work planned on Saturday,Sunday,or any legal <br /> holidays at least 48 hours prior to such work. <br /> C. The Contractor shall coordinate any construction or hauling activity in the vicinity of churches,schools, <br /> medical facilities,and funeral homes. The Contractor shall be cognizant of the disruptive effects of <br /> continued construction during funerals. The Owner reserves the right to temporarily stop construction <br /> within one block of,and during the time of,any funeral procession. No compensation shall be granted to <br /> the Contractor due to temporary delays caused by funerals. <br /> 1.3 TRAFFIC CONTROL <br /> A. Reference Specification 01555"Maintenance and Control of Traffic"of this Project Manual. <br /> 1.4 COORDINATION WITH BUSINESSES AND PRIVATE PROPERTY OWNERS ADJACENT TO THE PROJECT <br /> A. The Contractor shall notify all property owners and occupants adjacent to the project 2 days in advance to <br /> allow moving machinery and/or vehicles or other items that may be blocked in or damaged due to the <br /> upcoming construction in the area. Access to the properties shall be restored as soon as possible after each <br /> phase of construction. <br /> B. The Contractor shall maintain access to Dove Tree Apartments at all times. Coordinate construction in <br /> entrance with property owner. <br /> 1.5 COORDINATION WITH UTILITY COMPANIES <br /> A. The Contractor is responsible for working with public and private utility companies in protecting and/or <br /> relocating existing or new utility lines located near and affected by this construction. <br /> 1. Coordination with the utility companies is very important and should be considered in planning the <br /> work and the associated extra costs involved. <br /> City of Elk River-R13.119052 COORDINATION <br /> August 2019 PAGE 01310-1 <br /> V040110©Bolton&Menk,Inc.2019,All Rights Reserved <br />