My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.7. SR 08-19-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
08-19-2019
>
4.7. SR 08-19-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2019 3:32:57 PM
Creation date
8/15/2019 3:26:13 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01270-MEASUREMENT&PAYMENT <br /> PART 1-- GENERAL <br /> 1.1 SUMMARY <br /> A. Methods of measurement and payment for all items not individually specified shall be according to the <br /> appropriate referenced specification standard. <br /> 1.2 MEASUREMENT& PAYMENT <br /> A. Payment for Plan Quantity(P)Items: Items designated as Plan Quantity(P)shall be measured and paid for <br /> based on the quantity listed in the plans and no field measurement shall be made. The Engineer will only <br /> adjust the quantities on Plan Quantity(P)designated Contract items when the Engineer authorizes changes <br /> to the dimensions of that work(in which case only the affected portion will be re-determined)or when the <br /> Engineer determines that the quantity designated as a Plan Quantity(P) is incorrect. <br /> B. Payment for Hauled Materials: No compensation will be paid for any weigh ticket received after the date <br /> shown on the ticket unless prior arrangements are made with the Engineer. <br /> C. Payment for Materials Stored on Site: No compensation will be paid for materials delivered to the site and <br /> not incorporated into the project. <br /> D. Payment for Major Lump Sum Items: The Contractor shall submit a schedule of values for major items of <br /> construction that are bid as lump sum. The schedule shall identify major sections of work and the <br /> percentage of the bid price applied to each. Payment shall be made according to the percentage complete <br /> of each major section of work. <br /> 1.3 SUBMITTALS <br /> A. The Contractor shall submit to the Engineer a "Certificate of Conformance"statement stating that the scale <br /> used to weigh hauled materials has been tested and calibrated for the current construction season. This <br /> Certificate shall be from MnDOT or other reliable scale servicing company. Providing a certified scale and <br /> obtaining such "Certificate of Conformance" is the sole responsibility of the Contractor and all costs <br /> associated are considered incidental to the materials being supplied. <br /> B. Hauled Materials:The Contractor shall furnish numbered weigh tickets which list the Date, Project,Type of <br /> Material, Gross Weight,Tare Weight, Material Weight in tons,and Truck Number for each load brought to <br /> the construction site. If the individual pay items are identified on a unit weight basis,the Contractor shall <br /> provide the Engineer with a summary type spreadsheet which provides accumulative job totals of all <br /> aggregate and bituminous materials hauled to the project. This spreadsheet shall be submitted to the <br /> Engineer on a weekly basis. <br /> C. Procured Materials:The Contractor shall furnish an insurance bond showing the type of material,the <br /> amount of material,the valuation of the material,the stored location,the project,the date,the name and <br /> address of the surety. <br /> D. Compacted Volume Materials:When measurement is specified by the CUBIC YARD, (CY)COMPACTED <br /> VOLUME (CV),will be determined by length,width and depth measurements of the material in its placed <br /> and compacted position,according to the placement dimensions as shown in the Contract or as designated <br /> by the Engineer. <br /> PART 2-- PRODUCTS(NOT USED) <br /> PART 3-- EXECUTION(NOT USED) <br /> ****END OF SECTION**** <br /> City of Elk River-R13.119052 MEASUREMENT& PAYMENT <br /> August 2019 PAGE 01270-1 <br /> V011714©Bolton&Menk,Inc.2019,All Rights Reserved <br />
The URL can be used to link to this page
Your browser does not support the video tag.