My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.7. SR 08-19-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
08-19-2019
>
4.7. SR 08-19-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2019 3:32:57 PM
Creation date
8/15/2019 3:26:13 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Private utility companies are responsible for their own lines and are so obligated under City Code <br /> Agreements to protect and/or relocate their utilities, if required to install new City owned utilities in a <br /> given area. <br /> B. The Contractor shall consult with the City's maintenance personnel when working around or performing the <br /> required sanitary sewer installations. <br /> C. The Contractor shall also work with the City's maintenance personnel to provide for scheduled water shut- <br /> downs in a given area and to provide for continued water service to the properties along the project <br /> throughout the duration of the project. <br /> D. The Contractor shall work with all utility companies,as necessary,to allow for installation and for <br /> maintenance of service of gas, power, lighting,telephone,cable TV,etc. in the boulevards or across the <br /> streets prior to final shaping of aggregate base and/or topsoil. This coordination with the utility companies <br /> is the responsibility of the Contractor and is considered incidental to the construction and no additional <br /> compensation shall be granted. <br /> 1.6 COOPERATION WITH FIRE& EMERGENCY DEPARTMENTS <br /> A. The Contractor shall coordinate all work requiring shutting down water service or limiting access to <br /> buildings by emergency equipment with the fire&emergency departments. This shall include notification <br /> of the daily construction schedule by the Contractor. <br /> 1.7 COOPERATION WITH OTHER CONTRACTORS <br /> A. The Contractor shall cooperate with other contractors performing construction on other projects in the <br /> vicinity of this Project,including but not limited to allowing access for the delivery of equipment and <br /> materials. <br /> 1.8 COORDINATION WITH SERVICE PROVIDERS <br /> A. The Contractor shall coordinate with the postal service, recycling service,garbage collection service,school <br /> bus service,etc.to maintain continual uninterrupted service to all residences and businesses throughout <br /> the duration of the project. <br /> B. The Contractor shall temporarily relocate mailboxes, haul recycling and garbage for residents to a <br /> designated pick up location,etc.,as required by the subject service provider. All equipment materials and <br /> labor required to coordinate with service providers and maintain services shall be incidental to the <br /> Contract. <br /> PART 2-- PRODUCTS(NOT USED) <br /> PART 3-- EXECUTION(NOT USED) <br /> ****END OF SECTION**** <br /> City of Elk River-R13.119052 COORDINATION <br /> August 2019 PAGE 01310-2 <br /> V040110©Bolton&Menk,Inc.2019,All Rights Reserved <br />
The URL can be used to link to this page
Your browser does not support the video tag.