Laserfiche WebLink
Shane M. Nelson, P.E. <br />Page 1 of 1 <br /> <br />SUMMARY <br />Mr. Shane Nelson, P.E., is a Vice President of the firm. He has over 19 <br />years of engineering experience working with municipal clients. Shane is <br />currently the appointed City Engineer for the City of Nowthen and <br />Township Engineer for Credit River Township and consults to a number of <br />cities including Ramsey, St. Michael and Elk River. <br />EXPERIENCE <br />Shane has experience in the design and construction of Municipal State Aid, <br />Federal Aid, residential, and commercial streets; residential and commercial <br />plan review; comprehensive storm sewer planning; site and utility design; <br />community sewage treatment systems; MS4 storm water planning; Wetland <br />Conservation Act administration; and roadway maintenance plans. <br />PROJECT EXAMPLES <br />MISSISSIPPI RIVER REGIONAL TRAIL EXPANSION, ANOKA <br />COUNTY – Anoka County retained Hakanson Anderson to prepare the <br />detailed design, Project Memorandum, specifications and construction <br />management for this extension of the Mississippi River Trail. This project <br />received federal funding and the total project cost was $800,000. <br />2017 STREET IMPROVEMENTS, CITY OF ELK RIVER – The City <br />of Elk River retained Hakanson Anderson to prepare the Feasibility Report, <br />detailed design, specifications, and construction management for the <br />various local and state-aid City streets. The project received state aid funds <br />and the total project cost was approximately $4.6 Million. <br />CENTER STREET, CITY OF RAMSEY - The City of Ramsey retained <br />Hakanson Anderson to prepare the preliminary design, construction plans, <br />and construction management for Center Street located within The β€œCOR”. <br />The project consisted of design of new street and utilities, including sanitary <br />sewer, watermain, storm sewer, street furniture, street lighting, and <br />landscaping. The total cost of the DEED funded project was $500,000. <br />MSA STREET AND LOCAL STREET REHABILITATION <br />PROJECTS, CITY OF ST. MICHAEL - The City of St. Michael retained <br />Hakanson Anderson to prepare detailed plans and specifications for the <br />rehabilitation of several MSA streets, including Jamison Avenue, Frankfort <br />Parkway, 34th Street, Carissa Lane, and Oakwood Parkway. This project <br />consisted of milling the surface bituminous layer, installing paving fabric to <br />add strength and reduce reflective cracking, and constructing a new <br />bituminous wearing course. Sub-surface drainage was also added in select <br />locations and numerous storm sewer manholes were rehabilitated. The <br />overall project costs were $1.3 Million and funding was obtained from State <br />Aid and local sources. <br />EDUCATION <br />Bachelor of Science Civil <br />Engineering <br />University of Minnesota <br />REGISTRATION <br />Licensed Professional Engineer <br />State of Minnesota <br />ORGANIZATIONS <br />City Engineer Association of <br />Minnesota <br />American Society of Civil <br />Engineers <br />Minnesota Surveyors & <br />Engineers Society