My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.9. SR 08-05-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
08-05-2019
>
4.9. SR 08-05-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 9:32:48 AM
Creation date
8/1/2019 9:17:14 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/5/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Shane M. Nelson, P.E. <br />Page 1 of 1 <br /> <br />SUMMARY <br />Mr. Shane Nelson, P.E., is a Vice President of the firm. He has over 19 <br />years of engineering experience working with municipal clients. Shane is <br />currently the appointed City Engineer for the City of Nowthen and <br />Township Engineer for Credit River Township and consults to a number of <br />cities including Ramsey, St. Michael and Elk River. <br />EXPERIENCE <br />Shane has experience in the design and construction of Municipal State Aid, <br />Federal Aid, residential, and commercial streets; residential and commercial <br />plan review; comprehensive storm sewer planning; site and utility design; <br />community sewage treatment systems; MS4 storm water planning; Wetland <br />Conservation Act administration; and roadway maintenance plans. <br />PROJECT EXAMPLES <br />MISSISSIPPI RIVER REGIONAL TRAIL EXPANSION, ANOKA <br />COUNTY β Anoka County retained Hakanson Anderson to prepare the <br />detailed design, Project Memorandum, specifications and construction <br />management for this extension of the Mississippi River Trail. This project <br />received federal funding and the total project cost was $800,000. <br />2017 STREET IMPROVEMENTS, CITY OF ELK RIVER β The City <br />of Elk River retained Hakanson Anderson to prepare the Feasibility Report, <br />detailed design, specifications, and construction management for the <br />various local and state-aid City streets. The project received state aid funds <br />and the total project cost was approximately $4.6 Million. <br />CENTER STREET, CITY OF RAMSEY - The City of Ramsey retained <br />Hakanson Anderson to prepare the preliminary design, construction plans, <br />and construction management for Center Street located within The βCORβ. <br />The project consisted of design of new street and utilities, including sanitary <br />sewer, watermain, storm sewer, street furniture, street lighting, and <br />landscaping. The total cost of the DEED funded project was $500,000. <br />MSA STREET AND LOCAL STREET REHABILITATION <br />PROJECTS, CITY OF ST. MICHAEL - The City of St. Michael retained <br />Hakanson Anderson to prepare detailed plans and specifications for the <br />rehabilitation of several MSA streets, including Jamison Avenue, Frankfort <br />Parkway, 34th Street, Carissa Lane, and Oakwood Parkway. This project <br />consisted of milling the surface bituminous layer, installing paving fabric to <br />add strength and reduce reflective cracking, and constructing a new <br />bituminous wearing course. Sub-surface drainage was also added in select <br />locations and numerous storm sewer manholes were rehabilitated. The <br />overall project costs were $1.3 Million and funding was obtained from State <br />Aid and local sources. <br />EDUCATION <br />Bachelor of Science Civil <br />Engineering <br />University of Minnesota <br />REGISTRATION <br />Licensed Professional Engineer <br />State of Minnesota <br />ORGANIZATIONS <br />City Engineer Association of <br />Minnesota <br />American Society of Civil <br />Engineers <br />Minnesota Surveyors & <br />Engineers Society
The URL can be used to link to this page
Your browser does not support the video tag.