Laserfiche WebLink
Project Approach, Page 16 <br />Project Approach - Section 3 <br />-built drawings and specifications. <br />Task 8 – Warranty Inspection <br />The Project Manager, Field Representative and a City Representative will conduct the warranty <br />inspection. <br />Deliverables: Written report of the warranty inspection. <br />Phase 16 – Additional Tasks <br />Task 1 - Future Interchange Layout <br />An interchange will ultimately be constructed at the intersection of Twin Lakes Road and Highway 10. <br />The intent of the future interchange layout task is to determine the interchange type, design, and right of <br />way impacts. It also includes modifications to TH 10 from the interchange location to TH 101 necessary <br />to construct the interchange. <br />There are two options to approach this task depending upon the involvement and partnership with <br />MnDOT for this process. <br />Option 1: MnDOT Level 1 Staff Approved Layout. This option includes the effort to determine the <br />interchange type and producing the layout meeting MnDOT standards, including signatures from all <br />project partners. This includes concept design, full layout design, cost estimate, design report, submittal <br />letter, comment responses and establishing right of way needs. <br />Option 2: Concept layout with construction limits and right of way needs identified. This includes <br />verifying interchange type with MnDOT and developing a concept layout showing our preferred <br />interchange configuration with preliminary construction limits. This layout would not have MnDOT <br />signatures and approval, but could be used for future reference as stated in the RFP scope.