<br /> Contract Documents, Contractor shall furnish and assume full responsibility for materials,
<br /> equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel,
<br /> power, light, heat, telephone, water, sanitary facilities, transportation, temporary facilities,
<br /> supplies, and other facilities and incidentals necessary for the furnishing, performance, testing,
<br /> start-up, and completion of the Work, whether or not incorporated therein.
<br /> 3.1.2 Regardless of any inspections, tests or approvals by Owner, Owner's Design Professional, or
<br /> third parties, Contractor shall perform and complete the Work in accordance with the Contract
<br /> Documents. Owner has no liability or responsibility to Contractor or any Surety of Contractor for
<br /> work performed by Contractor which is not in accordance with Contract Documents, regardless
<br /> of whether discovered during construction or after acceptance of the Work.
<br /> 3.1.3 Contractor shall not assign or transfer (other than by proper Subcontracts for which Contractor
<br /> shall remain responsible) any rights or obligations under the Agreement without the consent of
<br /> Owner, which consent may be granted or withheld in Owner's sole and absolute discretion.
<br /> 3.1.4 Contractor shall verify that the Work is in conformance with the requirements of the Contract
<br /> Documents before requesting observation or inspection by Owner.
<br /> 3.1.5 Contractor shall give the Owner's Authorized Representative twenty-four(24)hours written notice
<br /> before commencing Work or renewing Work where Work has been stopped for more than three
<br /> (3) Days. Contractor shall also give the same notice to Owner's CQA Consultant, if any.
<br /> 3.1.6 Prior to commencing Work, Contractor shall provide to Owner for Owner's consideration and
<br /> approval a list of labor and equipment rates to be applied in any request for a Change Order
<br /> under Article 7. Such list shall be all inclusive of trades and equipment Contractor anticipates
<br /> utilizing in completion of the Work.
<br /> 3.2 Review of Contract Documents and Field Conditions by Contractor.
<br /> 3.2.1 Contractor's execution of the Agreement constitutes Contractor's representation that it has
<br /> studied and compared the Contract Documents with each other and with information furnished
<br /> by Owner pursuant to Article 2.1 and has reported to the Owner's Authorized Representative any
<br /> discovered errors, inconsistencies, or omissions.
<br /> 3.2.2 Contractor shall take field measurements and verify field conditions and shall carefully compare
<br /> such conditions and other information known to Contractor with the Contract Documents before
<br /> commencing activities.
<br /> 3.2.3 Contractor shall make a reasonable attempt to understand the Contract Documents before
<br /> requesting interpretation from Owner.
<br /> 3.3 Conflicts, Errors,or Discrepancies. If Contractor finds any conflict, error,or discrepancy in the Contract
<br /> Documents, Contractor shall report same to Owner's Authorized Representative in writing at once, and
<br /> shall seek a written interpretation or clarification from Owner's Authorized Representative before
<br /> proceeding with the Work affected thereby. Contractor's failure to comply with this requirement shall
<br /> constitute a waiver of Contractor's right, if any, to seek an increase in the Contract Price or the Contract
<br /> Time or otherwise recover any consideration on account of such conflict, error or discrepancy. Contractor
<br /> shall be liable to Owner or to Owner's Design Professional for losses or expenses incurred by either of
<br /> them resulting from Contractor's failure to timely report any conflict, error, or discrepancy in the Contract
<br /> Documents if Contractor knew of should have reasonably known thereof.
<br /> 3.4 Supervision and Construction Procedures.
<br /> 3.4.1 Contractor shall supervise, direct, and inspect the Work competently and efficiently, devoting such
<br /> attention and applying such skills and expertise as necessary,to perform the Work in accordance
<br /> with the Contract Documents.
<br /> 3.4.2 Superintendent.
<br /> 1 Contractor shall employ a competent superintendent and necessary assistants who shall
<br /> be in attendance at the Site during performance of the Work. The superintendent shall