Laserfiche WebLink
2. For storm sewers and subdrains,all joints shall not permit the intrusion of soil or backfill materials. <br /> (a) If reinforced concrete pipe is used,the Contractor may at its own discretion choose to wrap each <br /> joint with a geotextile filter fabric,as specified, rather than place mastic in the joint. <br /> D. Bulkheading Open Pipe Ends <br /> 1. The Contractor shall furnish, install and maintain a temporary,water-tight plug adequately blocked in <br /> place to prevent flooding of the existing downstream sewer system. The plug shall be placed at the <br /> beginning of the project or at the end of each working day at the end of the day's operation. <br /> 2. When flows are diverted from an existing sewer or tile to be abandoned in place,the Contractor shall <br /> construct a water-tight plug on the open end of the abandoned pipe. <br /> 3. Permanent watertight plugs shall be constructed with concrete grout with a thickness of not less than <br /> 1 pipe diameter. <br /> 3.3 BEDDING AND BACKFILLING OPERATIONS <br /> A. Backfill material around all manholes,catch basins,valve boxes,curb boxes,and hydrants shall be <br /> compacted with hand machines. The maximum lift thickness shall be 6-inches. <br /> B. Flexible Pipe Materials <br /> 1. Unless otherwise shown on the plans,the pipe shall be bedded and backfilled with granular material <br /> compacted to 95 percent Standard Proctor Density or as recommended by the pipe manufacturer, <br /> whichever is denser,from 6.0-inches below the bottom of the pipe to 12.0-inches above the top of the <br /> pipe the full width of the trench. The Contractor shall bed and backfill the pipe as shown on the plan <br /> details. <br /> 2. Where the trench foundation has been found to be unstable and not suitable for bedding,the trench <br /> shall be undercut until acceptable conditions are found. The Contractor shall then install compacted <br /> foundation material to meet the line and grade specified on the plan. <br /> 3. Unless otherwise shown on the plans,select native material may be used as a trench backfill above the <br /> granular bedding up to the bottom of the subgrade except in those conditions where the top of the <br /> pipe is less than 12-inches from the bottom of the subgrade in which case granular material compacted <br /> to 100 percent Standard Proctor Density shall be used as trench backfill the full width of the trench to <br /> the bottom of the subgrade excavation zone. <br /> C. Rigid Pipe Materials <br /> 1. Unless otherwise shown on the plans, in ordinary or stable trench conditions,the bottom of the trench <br /> shall be first excavated to a depth of approximately 15 percent of the outside pipe diameter below the <br /> established grade for the bottom of the pipe. Then the bottom of the trench shall be further excavated <br /> to allow for the placement of 6.0-inches of granular bedding for a width of at least 60 percent of the <br /> outside diameter of the pipe. Pipe shall be placed on the bottom of the pre-shaped excavated trench. <br /> The bottom of the excavated trench shall be shaped to fit the circumference of the pipe up to 0.15 of <br /> the outside diameter of the pipe. The Contractor shall encase the pipe from the 0.15 outside diameter <br /> to the 0.60 diameter height of the pipe with granular material compacted to 95 percent Standard <br /> Proctor Density or as recommended by the pipe manufacturer,whichever is denser. <br /> 2. Where the trench foundation has been found to be unstable and not suitable for bedding,the trench <br /> shall be undercut until acceptable conditions are found. The Contractor shall then install compacted <br /> foundation material to meet the line and grade specified on the plan. <br /> 3. Unless otherwise shown on the plans,select native material may be used as trench backfill above the <br /> granular bedding up to the bottom of the subgrade except in those conditions where the top of the <br /> pipe is less than 12.0-inches from the bottom of the subgrade in which case granular material <br /> compacted to 100 percent Standard proctor Density shall be used as trench backfill the full width of the <br /> trench to the bottom of the subgrade excavation zone. <br /> D. Structures <br /> Elk River Landfill, Inc. -R16.115896 TRENCH EXCAVATION, BEDDING AND BACKFILL <br /> March 2019 PAGE 02320-4 <br /> V101807©Bolton&Menk,Inc.2018,All Rights Reserved <br />