My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 06-03-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
06-03-2019
>
8.1. SR 06-03-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 4:05:20 PM
Creation date
5/30/2019 3:36:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/3/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. All manholes,catch basins,valve boxes,water vaults, headwalls and miscellaneous structures shall be <br /> backfilled with granular backfill material and shall be compacted with a hand operated motorized <br /> compactor. <br /> E. All trench backfill shall be compacted in accordance with the Quality Compaction Method. <br /> 3.4 SOURCE QUALITY CONTROL <br /> A. The Owner shall arrange for having the following testing performed: <br /> 1. One gradation test per each 500 tons or 275 cubic yards(CV)of granular materials. <br /> 3.5 FIELD QUALITY CONTROL <br /> A. No exception to the referenced Specification is made. <br /> ***END OF SECTION*** <br /> Elk River Landfill, Inc. -R16.115896 TRENCH EXCAVATION, BEDDING AND BACKFILL <br /> March 2019 PAGE 02320-5 <br /> V101807©Bolton&Menk,Inc.2018,All Rights Reserved <br />
The URL can be used to link to this page
Your browser does not support the video tag.