3. Salvaging and separately stockpiling suitable aggregate base material,as determined by the Engineer, <br /> include in the price bid for common excavation. <br /> 4. Separating,salvaging,stockpiling and placing suitable material for use in embankment areas, include in <br /> the price bid for common excavation. <br /> 5. Obtaining suitable material from areas with no proposed structural improvements to provide enough <br /> suitable material for embankments being constructed under proposed structural improvements, <br /> include in the price bid for common excavation. <br /> 6. Restoring the borrow site by grading the area to drain properly to slopes not-to-exceed 6:1 and by <br /> restoring the topsoil to a minimum thickness of 6 inches, include in the contract unit price for common <br /> borrow. <br /> 7. Subgrade excavation,furnishing stabilizing aggregate,geotextile fabric installation,compaction, <br /> regrading and/or other efforts necessary to repair the subgrade after satisfying the roll test and failing <br /> to protect the integrity of the subgrade, include in the price bid for common excavation. <br /> 8. Over-excavation in cut areas to provide room for placement of topsoil, include in the price bid for <br /> common excavation. <br /> 9. The avoidance and protection of wetlands include in the price bid for common excavation. <br /> 10. Protecting existing improvements and previously accepted in-process improvements from damage <br /> include in the price bid for common excavation. <br /> 11. Test rolling, include in the price bid for common excavation. <br /> 12. Gradation and compaction testing,and geotechnical inspection services to meet requirements of <br /> Source and Field Quality Control, if required, include in the price bid for common excavation. <br /> 13. Farming,disking and/or drying suitable wet materials, include in the price bid for common excavation. <br /> 1.4 SPECIFICATION REFERENCES <br /> A. MnDOT 2105 shall apply to the excavation and embankment for the site improvements,except as modified <br /> herein. <br /> B. MnDOT 2574 shall apply to the excavation and embankment for the site improvements,except as modified <br /> herein. <br /> C. Unless noted otherwise,the provisions in this section are in addition to the referenced specification. <br /> PART 2-- PRODUCTS <br /> 2.1 MATERIALS <br /> A. All excess excavated material,with the exception of topsoil shall become the property of the Contractor <br /> and shall be removed from the site and disposed of at a site secured by the Contractor. <br /> B. Stabilizing aggregates for use in backfilling subgrade excavations shall be material generally produced and <br /> referred to as"1%-inch dust free aggregate",4.0 to 6.0-inch rubble aggregate"or other coarse aggregate <br /> found to be in general compliance by the Engineer. Aggregate base may also be used at the direction of the <br /> Engineer. <br /> PART 3-- EXECUTION <br /> 3.1 GENERAL <br /> A. Excavated topsoil and suitable material for reuse in the project shall be segregated and stockpiled at a site <br /> selected by the Contractor. <br /> B. Frozen material will not be allowed for roadway or building pad construction. The Engineer shall approve <br /> locations for placement of frozen material. <br /> Elk River Landfill, Inc. -R16.115896 EXCAVATION & EMBANKMENT-SITE GRADING <br /> March 2019 PAGE 02310-2 <br /> V122217©Bolton&Menk,Inc.2018,All Rights Reserved <br />