My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 06-03-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
06-03-2019
>
8.1. SR 06-03-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 4:05:20 PM
Creation date
5/30/2019 3:36:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/3/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. All excavations shall be kept free of water during the placement of fill. <br /> D. The Contractor shall utilize methods and equipment for excavating that will minimize the disturbance to the <br /> subgrade. The use of backhoes rather than scrapers or front-end loaders may be required to minimize <br /> repeated passes of equipment over wet subgrade soils. <br /> E. At the end of each day the Contractor shall eliminate surface indentations, including those caused by <br /> sheepsfoot rollers,tractor tires and tracked equipment,and roll the surface with a steel wheel or rubber <br /> tired roller. <br /> F. Sufficient common excavation shall be utilized by the Contractor to replace the soil shrinkage from <br /> excavation which occurs through the course of construction handling and compaction. The Contractor shall <br /> make his own estimate of the amount of shrinkage that will occur. <br /> G. Topsoil <br /> 1. Topsoil shall be salvaged and stockpiled in locations shown on the plans or in areas requiring final turf <br /> establishment,as approved by the Engineer. <br /> 2. Once the salvaged topsoil is stockpiled,the Contractor shall make an estimate of any potential shortage <br /> or surplus of topsoil possible in meeting the other provision of this Contract and notify the Engineer of <br /> the estimate. <br /> 3. The first priority in re-distributing the topsoil on site shall be to meet the minimum depths required <br /> over the entire project area. <br /> 4. In areas requiring final turf establishment with no proposed or anticipated structural improvements <br /> (building pads,etc.),topsoil shall be spread uniformly to a minimum depth of 6.0-inches, unless <br /> otherwise indicated in the plans. <br /> 5. In areas requiring final turf establishment with proposed or anticipated structural improvements <br /> (building pads,etc.),topsoil shall be spread to a depth of 2.0 to 4.0-inches. <br /> 6. In areas not requiring final turf establishment with proposed or anticipated structural improvements, <br /> no topsoil shall be placed. <br /> H. In areas where filling above the existing grade is necessary to establish the final designed elevation,the <br /> Contractor shall fully remove the topsoil and organic material to the level of stable underlying sand or clay <br /> prior to backfilling with suitable embankment material. <br /> I. The Contractor shall make his own determination as to whether the proposed grading has been completed <br /> according to the plans. When the Contractor determines that the grading has been completed, he will <br /> notify the Engineer. Neither the Owner nor the Engineer will provide any intermediate acceptance of the <br /> grading improvements until all of the grading has been completed and all topsoil has been spread. <br /> 3.2 EXCAVATION AND EMBANKMENT IN AREAS WITH PROPOSED STRUCTURAL IMPROVEMENTS. <br /> A. All vegetation,topsoil,organic,or other unsuitable materials shall be excavated from the area below the <br /> structural improvement. Due to the variability of soils,the depth of the excavation in these areas is <br /> expected to vary significantly throughout the site.The excavated area shall be inspected by the <br /> geotechnical engineer as specified in Field Quality Control. <br /> B. Subcut excavations shall be laterally oversized a distance of 1.0-foot beyond the edges of the proposed <br /> structural improvement for each foot of excavation depth (1:1 oversizing). The extents of the structural <br /> improvement areas shown on the plans do not necessarily show this 1:1 oversizing. <br /> C. Fill placed from the bottom of the subcut to the subgrade elevation shall be selected material from the <br /> excavation or borrow material. Such material shall consist of suitable material as defined above. Clay fill <br /> shall be moisture-conditioned to within 2 percent above or below the optimum moisture content <br /> determined from the Standard Proctor compaction test. <br /> D. The embankment material shall be spread in 6.0 to 8.0-inch loose lifts. <br /> Elk River Landfill, Inc. -R16.115896 EXCAVATION & EMBANKMENT-SITE GRADING <br /> March 2019 PAGE 02310-3 <br /> V122217©Bolton&Menk,Inc.2018,All Rights Reserved <br />
The URL can be used to link to this page
Your browser does not support the video tag.