My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 06-03-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
06-03-2019
>
8.1. SR 06-03-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 4:05:20 PM
Creation date
5/30/2019 3:36:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/3/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. The Engineer's review of a submittal shall not relieve the Contractor from the responsibility for deviation <br /> from the drawings and specifications unless the Contractor has, in writing,called the Engineer's attention to <br /> the deviations at the time of submission; nor shall it relieve the Contractor from the responsibility of errors <br /> in the submittals. <br /> B. All submittals shall be reviewed by the Engineer prior to their incorporation into the project. If materials <br /> are installed without prior review,they will be subject to removal,at the Contractor's expense, if the <br /> material is found to be non-conforming to the Specifications. <br /> **** END OF SECTION **** <br /> Elk River Landfill, Inc. -R16.115896 SUBMITTALS <br /> March 2019 PAGE 01330-3 <br /> V062612 ©Bolton&Menk,Inc.2018,All Rights Reserved <br />
The URL can be used to link to this page
Your browser does not support the video tag.