Laserfiche WebLink
(a) This item pertains to the full construction of Lift Station 2 and valve manhole 15 and meter MH 13. <br /> This work includes: <br /> (1) Excavation, backfill and compaction. <br /> (2) Concrete structures and castings. <br /> (3) Pumps and level controls <br /> (4) All pipe,fitting and valve work. <br /> (5) Electrical and controls work. <br /> (6) Meter and Controls. <br /> (b) Reference specifications include Sections: <br /> (1) 03400—Precast Concrete Vaults and Structures <br /> (2) 11309—Lift Station Structure <br /> (3) 11311—Submersible Centrifugal Pumps <br /> (4) 16050—Common Work Results for Electrical <br /> (5) 16052—Supporting Devices <br /> (6) 16110—Raceways, Fitting and Boxes <br /> (7) 16120—600 Volt Conductors and Cables <br /> (8) 16440—Safety Switches <br /> (9) 16550—Grounding and Bonding for Electrical Systems <br /> (10) 16500—Lighting <br /> (11) 16621—Transfer Switches <br /> (12) 16903—Submersible Lift Station Control System <br /> 27. Bid Item B-27: Tank 4 Pump and Controls Upgrades <br /> (a) This item pertains to the work performed in the existing pumphouse at Tank 4,to include <br /> replacement of the pump and demolition and replacement of electrical panels and controls <br /> systems inside the pumphouse. <br /> (b) Reference specifications include Sections: <br /> (1) 11310—Centrifugal Wastewater Pumps <br /> (2) 16050—Common Work Results for Electrical <br /> (3) 16051—Selective Electrical Demolition <br /> (4) 16052—Supporting Devices <br /> (5) 16110—Raceways, Fitting and Boxes <br /> (6) 16120—600 Volt Conductors and Cables <br /> (7) 16440—Safety Switches <br /> (8) 16550—Grounding and Bonding for Electrical Systems <br /> (9) 16500—Lighting <br /> (10) 16903—Submersible Lift Station Control System <br /> 28. Bid Item B-28: Catch Basin Structure Design G (CB 22) <br /> Elk River Landfill, Inc. -R16.115896 SUMMARY OF WORK <br /> March 2019 PAGE 01110-11 <br /> V040111 ©Bolton&Menk,Inc.2018,All Rights Reserved <br />