(a) This item pertains to the construction of proposed catch basin 22 in the load-out station near <br /> existing Tank 1. <br /> (b) Reference specification Section 02530—Pipe Sewers—Sanitary <br /> 29. Bid Item B-29: Connect to Existing Dual-Contain Pipeline <br /> (a) This item pertains to the construction of a dual-contained splice connection from an existing <br /> leachate line to a proposed leachate line. <br /> (b) The sizing of the pipes for the connection shall account for the size of the mechanical restraint <br /> coupling required to make the connection between the existing and proposed carrier pipes. <br /> 30. Bid Item B-30: 4" Polystyrene Insulation <br /> (a) This item pertains to the furnishing and installing of polystyrene insulation over the forcemain <br /> from Station 233+50 to 248+50 as well as the additional layer of insulation required at the <br /> drainage crossings on the west side slope of the landfill. <br /> (b) Reference specification Section 02535-Forcemain <br /> 31. Bid Item B-31: Forcemain Fittings <br /> (a) This item pertains to fittings placed on the forcemain, primarily bends and sleeves,as needed to <br /> accomplish the alignment as shown on the plans and to connect the forcemain at all manholes and <br /> other intermediate locations required for construction. <br /> (b) Reference specification Section 02535- Forcemain. <br /> 32. Bid Item B-32: Sanitary Manhole, Des.4007 (MH 20) <br /> (a) This item pertains to sanitary manhole 20 constructed near existing Tank 1. <br /> (b) Reference specification Section 02530—Pipe Sewers-Sanitary. <br /> 33. Bid Item B-33: Valve Manhole, Des 60-4020(MH 18) <br /> (a) This item pertains to the valve manhole 15 constructed near existing Tank 1 and pertains only to <br /> the manhole structure. Valve and fittings shall be paid separately. <br /> (b) Reference specification Section 02530—Pipe Sewers-Sanitary. <br /> 34. Bid Item B-34: Valve Manhole, Des 120-4020(MH 14) <br /> (a) This item pertains to the valve manhole 12 constructed near proposed Lift Station 2 and pertains <br /> only to the manhole structure. Valve and fittings shall be paid separately. <br /> (b) Reference specification Section 02530—Pipe Sewers-Sanitary. <br /> 35. Bid Item B-35: Air Relief and Cleanout Manhole- HDPE 72" (MH 16& 17) <br /> (a) This item pertains to the manholes constructed on top of the landfill cap at Stations 238+00 and <br /> 241+71. The air relief and cleanout assemblies shall be paid separately. <br /> (b) Reference specification Section 02535—Forcemain. <br /> 36. Bid Item B-36: Load-Out Manhole, Des 48-4020(MH 21) <br /> (a) This item pertains to the load-out manhole constructed adjacent to the load-out station near <br /> existing Tank 1. The interior piping and valve assemblies shall be paid separately. <br /> (b) Reference specification Section 02535—Forcemain. <br /> 37. Bid Item B-37: Air Relief Valve Assembly(MH 16& 17) <br /> (a) This item pertains to the furnishing and assembly of the air relief valve and piping material inside <br /> the air relief manhole structures(Item B-35). <br /> (b) Reference specification Section 02535—Forcemain <br /> Elk River Landfill, Inc. -R16.115896 SUMMARY OF WORK <br /> March 2019 PAGE 01110-12 <br /> V040111 ©Bolton&Menk,Inc.2018,All Rights Reserved <br />