Laserfiche WebLink
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> 3.5. Study Process <br /> An application to interconnect a DER that does not meet the Simplified Process or Fast <br /> Track Process eligibility requirements or does not pass the review as described in either <br /> process, shall be evaluated under the Study Process. <br /> 3.6. Process Assistance <br /> Prior to submitting an Interconnection Application, the Interconnection Customer may <br /> ask the Area EPS Operator's DER Interconnection Coordinator which process track a <br /> proposed interconnection is subject to and about additional details regarding each <br /> process track. <br /> An Interconnection Customer can obtain, through an informal request, general <br /> information about the Interconnection Process and about potentially Affected <br /> System(s) for a proposed interconnection at a specific location. The existing electric <br /> system information provided to the Interconnection Customer should include relevant <br /> system study results, interconnection studies, and other materials useful to an <br /> understanding of an interconnection at a particular point on the Area EPS Operator's <br /> System. Information will be provided to the extent such provision does not violate the <br /> privacy policies of the Area EPS Operator, confidentiality provisions of prior agreements <br /> or critical infrastructure requirements. The Area EPS Operator shall comply with <br /> reasonable requests for such information. <br /> 4 Interconnection Application <br /> 4.1. Overview <br /> Each process track has different information that needs to be provided to the Area EPS <br /> Operator.Table 4.1 indicates which application is to be completed in its entirety and <br /> submitted to the Area EPS Operator to start the interconnection process for the <br /> proposed DER system. <br /> Table 4.1. Interconnection Application <br /> Process Track Application <br /> Simplified Simplified Interconnection Application <br /> Fast Track Standard Interconnection Application <br /> Study Standard Interconnection Application <br /> The Area EPS Operator will provide all necessary Interconnection Applications, <br /> Interconnection Process documents and sample interconnection agreements on its <br /> website if possible.The Area EPS Operator will also accept Interconnection Applications <br /> 6 <br /> 141 <br />