Laserfiche WebLink
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> submitted electronically either through a web portal or to an email address specified by <br /> the Area EPS Operator. The Area EPS Operator may allow the Interconnection <br /> Application to be submitted with an electronic signature. <br /> 4.2. Availability of Information <br /> The Area EPS Operator will provide all necessary Interconnection Applications, <br /> Interconnection Process documents and sample interconnection agreements on its <br /> website if possible. If a website is not available, the applicable documents will be <br /> readily available at the Area EPS Operator's main office. <br /> The Area EPS Operator will establish a public queue of active interconnection <br /> applications on its website once the Area EPS Operator has received at least 40 <br /> completed Interconnection Applications in a year.The public queue will be updated, at <br /> minimum, on a monthly basis. <br /> 4.3. Interconnection Application Process Fees <br /> Each Interconnection Application submitted to the Area EPS Operator must include the <br /> appropriate interconnection application process fee prior to the Area EPS Operator <br /> reviewing the Interconnection Application. The required process fee for each process <br /> track is listed in Table 4.2. <br /> Table 4.2. Interconnection Application Process Fee <br /> Process Track Process Fee <br /> Simplified $100 <br /> Certified'System $100+$1/kW <br /> Fast Track <br /> Non-Certified System $100+$2/kW <br /> Study $1,000+$2/kW down payment. <br /> Additional study fees may apply. <br /> 4.4. Application Review Timelines <br /> The Interconnection Application shall be date- and time-stamped upon initial, and if <br /> necessary, resubmission receipt.The Area EPS Operator shall notify the <br /> Interconnection Customer if the Interconnection Application is deemed incomplete <br /> within ten (10) Business Days. This notification shall include a written list detailing all <br /> information that must be provided to complete the Interconnection Application. <br /> Depending on the process track the Interconnection Customer has between five (5) and <br /> ten (10) Business Days to provide the missing information unless additional time is <br /> 5 Additional information regarding certified equipment is found in Sections 14 and 15. <br /> 7 <br /> 142 <br />