My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 2-STANDARD CONTRACTS <br /> Minnesota DER Technical Interconnection and Interoperability Requirements in E-999/CI-16- <br /> 521 (anticipated July 2019.) <br /> Nameplate Rating- nominal voltage (V), current (A), maximum active power (kWac), apparent <br /> power (kVA), and reactive power(kVar) at which a DER is capable of sustained operation. For a <br /> Local EPS with multiple DER units, the aggregate nameplate rating is equal to the sum of all <br /> DERs nameplate rating in the Local EPS. For purposes of the Attachment V in the <br /> Interconnection Agreement, the DER system's capacity may, with the Area EPS's agreement, be <br /> limited thought use of control systems, power relays or similar device settings or adjustments <br /> as identified in IEEE 1547. The nameplate ratings referenced in the Interconnection Process are <br /> alternating current nameplate DER ratings at the Point of DER Coupling. <br /> Network Upgrades—Additions, modifications, and upgrades to the Transmission System <br /> required at or beyond the point at which the DER interconnects with the Area EPS Operator's <br /> System to accommodate the interconnection with the DER to the Area EPS Operator's System. <br /> Network Upgrades do not include Distribution Upgrades. <br /> Operating Requirements—Any operating and technical requirements that may be applicable <br /> due to the Transmission Provider's technical requirements or Minnesota Technical <br /> Requirements, including those set forth in the Interconnection Agreement. <br /> Party or Parties—The Area EPS Operator and the Interconnection Customer. <br /> Point of Common Coupling(PCC)—The point where the Interconnection Facilities connect with <br /> the Area EPS Operator's Distribution System. See figure 1. Equivalent, in most cases, to "service <br /> point" as specified by the Area EPS Operator and described in the National Electrical Code and <br /> the National Electrical Safety Code. <br /> Municipal Minnesota Interconnection Agreement_January 2019 28 <br /> 119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.