Laserfiche WebLink
SCHEDULE 2-STANDARD CONTRACTS <br /> Area Electric Power System(Area EPS) <br /> Petit of Commoi if <br /> Coupling(PCCJ r PCC PCC <br /> PoC PoC PoC <br /> N <br /> P.0 �. <br /> DNSt�ibteL# Distributed:, `y lament <br /> Energy Energy ?`Device <br /> Resource "' Resource <br /> (DM un W (DER)unit <br /> Local EPS 1 Local EPS 3 Distributed <br /> - Energy <br /> y Reso arre <br /> PCC —+ PQC— ►'ll (DER unit <br /> Pot ---► <br /> point oft r--+ <br /> connection <br /> '„. ,,, <br /> (POD "` <br /> Distnbu.-`.•. Distributed <br /> Energy .,.tementeI Energy Distributed <br /> .Rescurce P R Device Resource Energy <br /> Di_a)unit ., (DER)unit Resource <br /> (DER)unit <br /> Local EPS 2 Lace EEFSa LocalEPS5 <br /> . J <br /> Figure 1: Point of Common Coupling and Point of DER Connection <br /> (Source: IEEE 1547) <br /> Point of DER Connection (PoC)—When identified as the Reference Point of Applicability,the <br /> point where an individual DER is electrically connected in a Local EPS and meets the <br /> requirements of this standard exclusive of any load present in the respective part of the Local <br /> EPS (e.g. terminals of the inverter when no supplemental DER device is required.) For DER <br /> unit(s) that are not self-sufficient to meet the requirements without a supplemental DER <br /> device(s), the Point of DER Connection is the point where the requirements of this standard are <br /> met by DER in conjunction with a supplemental DER device(s) exclusive of any load present in <br /> the respective part of the Local EPS. <br /> Queue Position—The order of a valid Interconnection Application, relative to all other pending <br /> valid Interconnection Applications, that is established based upon the date- and time- of receipt <br /> of the complete Interconnection Application as described in Section 4.7 of the Overview <br /> ProcessError! Reference source not found.. <br /> Reasonable Efforts—With respect to an action required to be attempted or taken by a Party <br /> under these procedures, efforts that are timely and consistent with Good Utility Practice and <br /> are otherwise substantially equivalent to those a Party would use to protect its own interests. <br /> Municipal Minnesota Interconnection Agreement_January 2019 29 <br /> 120 <br />