My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 2-STANDARD CONTRACTS <br /> Interconnection Customer—The person or entity, including the Area EPS Operator, whom will <br /> be the owner of the DER that proposes to interconnect a DER(s) with the Area EPS Operator's <br /> Distribution System.The Interconnection Customer is responsible for ensuring the DER(s) is <br /> designed, operated and maintained in compliance with the Minnesota Technical Requirements. <br /> Interconnection Facilities—The Area EPS Operator's Interconnection Facilities and the <br /> Interconnection Customer's Interconnection Facilities. Collectively, Interconnection Facilities <br /> include all facilities and equipment between the DER and the Point of Common Coupling, <br /> including any modification, additions or upgrades that are necessary to physically and <br /> electrically interconnect the DER to the Area EPS Operator's System. Some examples of <br /> Customer Interconnection Facilities include: supplemental DER devices, inverters, and <br /> associated wiring and cables up to the Point of DER Connection. Some examples of Area EPS <br /> Operator Interconnection Facilities include sole use facilities; such as, line extensions, controls, <br /> relays, switches, breakers, transformers and shall not include Distribution Upgrades or Network <br /> Upgrades. <br /> Interconnection Process—The Area EPS Operator's interconnection standards in this <br /> document. <br /> Material Modification—A modification to machine data, equipment configuration or to the <br /> interconnection site of the DER at any time after receiving notification by the Area EPS <br /> Operator of a complete Interconnection Application that has a material impact on the cost, <br /> timing, or design of any Interconnection Facilities or Upgrades, or a material impact on the cost, <br /> timing or design of any Interconnection Application with a later Queue Position or the safety or <br /> reliability of the Area EPS.' <br /> MN Technical Requirements—The term including all of the DER technical interconnection <br /> requirement documents for the state of Minnesota; including Attachment 2 Distributed <br /> Generation Interconnection Requirements established in the Commission's September 28, 2004 <br /> Order in E-999/CI-01-1023) until superseded and upon Commission approval of updated <br /> A Material Modification shall include,but may not be limited to,a modification from the approved <br /> Interconnection Application that: (1)changes the physical location of the point of common coupling;such that it is <br /> likely to have an impact on technical review; (2)increases the nameplate rating or output characteristics of the <br /> Distributed Energy Resource;(3)changes or replaces generating equipment,such as generator(s),inverter(s), <br /> transformers,relaying,controls,etc.,and substitutes equipment that is not like-kind substitution in certification,size, <br /> ratings,impedances,efficiencies or capabilities of the equipment;(4)changes transformer connection(s)or <br /> grounding;and/or(5)changes to a certified inverter with different specifications or different inverter control settings <br /> or configuration.A Material Modification shall not include a modification from the approved Interconnection <br /> Application that:(1)changes the ownership of a Distributed Energy Resource; (2)changes the address of the <br /> Distributed Energy Resource,so long as the physical point of common coupling remains the same; (3)changes or <br /> replaces generating equipment such as generator(s), inverter(s),solar panel(s),transformers,relaying,controls,etc. <br /> and substitutes equipment that is a like-kind substitution in certification,size,ratings, impedances,efficiencies or <br /> capabilities of the equipment;and/or(4)increases the DC/AC ratio but does not increase the maximum AC output <br /> capability of the Distributed Energy Resource in a way that is likely to have an impact on technical review. <br /> Municipal Minnesota Interconnection Agreement_January 2019 27 <br /> 118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.