My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> Export Capacity Limitation * <br /> Is the export capability of the DER limited? ❑ Yes ❑ No <br /> If the DER export capacity is limited, complete the following sections and include information material <br /> explaining the limiting capabilities. <br /> Maximum Physical Export Capacity Requested: kWac <br /> If Yes, please provide additional details describing method of export limitation: <br /> Load Information * <br /> Interconnection Customer's or Customer-sited Load: kWac <br /> Typical Reactive Load (if known): <br /> Equipment Certification * <br /> Is the DER equipment certified? ❑ Yes ❑ No <br /> Please list all IEEE 1547 certified equipment below. Include all certified equipment manufacturer <br /> specification sheets with the Interconnection Application submission. <br /> Equipment Type Certifying Entity <br /> 1 <br /> 2 <br /> 3 <br /> 4 <br /> *Indicates section must be completed. <br /> ELK RIVER MUNICIPAL UTILITIES 4 <br /> 232 <br />
The URL can be used to link to this page
Your browser does not support the video tag.