Laserfiche WebLink
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> Prime Mover * <br /> Please indicate the prime mover: <br /> ❑ Solar Photovoltaic 0 Microturbine ❑ Fuel Cell <br /> 0 Reciprocating Engine 0 Gas Turbine 0 Other (please specify) <br /> Is the prime mover compatible with certified protection equipment package? ❑ Yes 0 No <br /> DER Manufacturer: Model Name & Number: Version: <br /> List of Adjustable Set Points for Protection Equipment or Software: <br /> Summer Name Plate Rating: kW„ Summer Name Plate Rating: kW„ <br /> Winter Name Plate Rating: kVAaC Winter Name Plate Rating: kVApc <br /> Rated Power Factor: Leading: Lagging: <br /> A completed Power System Load Flow data sheet must be supplied with the Interconnection <br /> Application. <br /> Only appropriate sections beyond this point until the signature page are to be completed. <br /> Distributed Energy Resource Characteristic Data (for Inverter-based machines) <br /> Max design fault contribution current: <br /> Is your response to the previous field an Instantaneous or RMS 0 Instantaneous 0 RMS <br /> measurement? <br /> Harmonic Characteristics: <br /> Start-up Requirements: <br /> *Indicates section must be completed. <br /> ELK RIVER MUNICIPAL UTILITIES 5 <br /> 233 <br />