My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> Application Agent * <br /> Is the Customer using an Application Agent for this application? ❑ Yes 0 No <br /> If Interconnection Customer is not using an Application Agent, please skip to the next section. <br /> Application Agent: <br /> Company Name: <br /> Email: Phone: <br /> Distributed Energy Resource Information * <br /> Estimated Installation Date: <br /> Location (if different from mailing address of Interconnection Customer): <br /> Will the Proposed DER system be interconnected to an existing electric service? 0 Yes ❑ No <br /> Is the Distributed Energy Resource a single generating unit or multiple? 0 Single 0 Multiple <br /> DER Type (Check all that apply): <br /> ❑ Solar Photovoltaic ❑ Wind 0 Energy Storage <br /> ❑ Combined Heat and Power 0 Solar Thermal 0 Other (please specify) <br /> DER systems with Energy Storage must also submit the Energy Storage Application to the Utility. <br /> Total Number of Distributed Energy Resources to be <br /> interconnected pursuant to this Interconnection Application: <br /> Phase configuration of Distributed Energy Resource(s): 0 Single Phase 0 Three Phase <br /> Type of Generator: 0 Inverter 0 Synchronous 0 Induction <br /> Aggregate DER Capacity(the sum of nameplate capacity of all generation and storage devices at the <br /> PCC): <br /> kWac kVAac <br /> *Indicates section must be completed. <br /> ELK RIVER MUNICIPAL UTILITIES 3 <br /> 231 <br />
The URL can be used to link to this page
Your browser does not support the video tag.