My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> General * <br /> Select Review Process: ❑ Fast Track Process ❑ Study Process <br /> ❑ New Distribution Energy ❑ Capacity Addition or Material Modification <br /> Application is for: Resource to Existing Distributed Energy Resource <br /> If Capacity Addition or Material Modification to existing facility, please describe: <br /> Distributed Energy Resource will be used for what reason? (Check all that apply): <br /> ❑ Net Metering ❑ Supply Power to Interconnection Customer <br /> ❑ Supply Power to Area EPS <br /> Installed DER System Cost (before incentives): $ <br /> Interconnection Customer * <br /> Full Name (must match the name of the existing service account): <br /> Account Number: Meter Number: <br /> Mailing Address: <br /> City: State: Zip Code: <br /> Email: Phone: <br /> *Indicates section must be completed. <br /> ELK RIVER MUNICIPAL UTILITIES 2 <br /> 230 <br />
The URL can be used to link to this page
Your browser does not support the video tag.