My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> Interconnection Application <br /> Persons interested in applying for the interconnection of a distributed energy resource to the Utility's <br /> distribution system through the Fast Track or Study Processes are to fill out this Interconnection <br /> Application. The Interconnection Application is to be filled out completely by the applicant or as noted <br /> in each section of the application. The Utility will contact the applicant within 10 business days once the <br /> Interconnection Application and the corresponding processing fee is submitted to the Utility. The Utility <br /> will then notify the applicant of the completeness of their application. If the application is deemed <br /> incomplete by the Utility, the Utility will provide the applicant with a list of missing material.The <br /> applicant will then have 10 business days to provide the Utility with this information or request an <br /> extension, otherwise the application will be deemed incomplete and the applicant will lose their place in <br /> the queue. Section that are noted with * are required to be filled out. <br /> Checklist for Submission to Utility <br /> The items below shall be included with submittal of the Interconnection Application to the Utility. <br /> Failure to include all items will deem the Interconnection Application incomplete. <br /> Included <br /> Non-Refundable Processing Fee <br /> Fast Track <br /> • $100+$1/kW for Certified Systems <br /> ❑ Yes <br /> • $100+$2/kW for Non-Certified Systems <br /> Study Process <br /> • $1,000+$2/kW down payment. Additional study fees may apply. <br /> One-line diagram <br /> • This one-line diagram must be signed and stamped by a Professional <br /> Engineer licensed in Minnesota if the DER is uncertified greater than 20 kW ❑ Yes <br /> AC or if certified system is over 250 kW. <br /> • Details required on one-line diagram specified at the end of the <br /> interconnection application. <br /> Schematic drawings for all protection and control circuits, relay current circuits, ❑ Yes <br /> relay potential circuits, and alarm/monitoring circuits <br /> Inverter Specification Sheet(s) (if applicable) ❑ Yes <br /> Documentation that describes and details the operation of protection and control ❑ Yes <br /> schemes <br /> Documentation showing site control ❑ Yes <br /> Aerial map showing DER system layout including major roadways and true north ❑ Yes <br /> Possible Additional Documentation <br /> • If the DER export capacity is limited, include information material explaining the limiting <br /> capabilities. <br /> • If Energy Storage is included with the proposed DER system include the Energy Storage <br /> Application. <br /> ELK RIVER MUNICIPAL UTILITIES 1 <br /> 229 <br />