My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> Information Required on One-Line Diagram <br /> An Interconnection Application must include a site electrical one-line diagram showing the configuration <br /> of all Distributed Energy Resource equipment, current and potential circuits, and protection and control <br /> schemes. The one-line diagram shall include: <br /> • Applicant name. <br /> • Application ID. <br /> • Installer name and contact information. <br /> • Address where DER system will be installed - must match application address. <br /> o Be sure to list the address for the protective interface equipment if the protective <br /> interface equipment is located at a different address than the DER system. <br /> • Correct positions of all equipment, including but not limited to panels, inverter, and DC/AC <br /> disconnect. Include distances between equipment, and any labeling found on equipment. <br /> ELK RIVER MUNICIPAL UTILITIES <br /> 228 <br />
The URL can be used to link to this page
Your browser does not support the video tag.