My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> Interconnection Agreement <br /> Proposed DER interconnections that are also deemed Qualifying Facilities under Minnesota Statutes <br /> §2168.164 are eligible to sign the Utility's Uniform Contract for Cogeneration and Small Power <br /> Production Facilities. Included in this agreement are payment terms for excess power generated by <br /> the proposed DER system the Utility may purchase. In lieu of the Utility's Uniform Contract for <br /> Cogeneration and Small Power Production Facilities, the Interconnection Customer may choose to <br /> instead sign the Municipal Minnesota Interconnection Agreement(MMIA). <br /> The Interconnection Customer requests an MMIA to be executed in lieu of the <br /> Utility's Uniform Contract for Cogeneration and Small Power Production 0 Yes 0 No <br /> Facilities. <br /> Disclaimers — Must be completed by Interconnection Customer <br /> Initials <br /> The Interconnection Customer has opportunities to request a timeline extension <br /> during the interconnection process. Failure by the Interconnection Customer to <br /> meet or request an extension for a timeline outlined in the Interconnection Process <br /> could result in a withdrawn queue position and the need to re-apply. <br /> Propose DER interconnection to the Utility's distribution submitted under the <br /> Simplified Process may be moved into the Fast Track Process if engineering screens <br /> are failed during the Simplified Application review. <br /> Application Signature —Must be completed by Interconnection Customer <br /> I designate the individual or company listed as my Application Agent to serve as my <br /> agent for the purpose of coordinating with the Area EPS Operators on my behalf <br /> throughout the interconnection process. Initials <br /> I hereby certify that, to the best of my knowledge, the information provided in this Application is true, <br /> and that I have appropriate Site Control in conformance with the Interconnection Process. I agree to <br /> abide by the Municipal Minnesota Distributed Energy Resource Interconnection Process (M-MIP) and <br /> return the Certificate of Completion when the DER has been installed. <br /> Applicant Signature: Date: <br /> ***Please print clearly or type and return completed along with any additional documentation*** <br /> ELK RIVER MUNICIPAL UTILITIES <br /> 227 <br />
The URL can be used to link to this page
Your browser does not support the video tag.