My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> Electric Distribution System Information - Continued <br /> Info Not <br /> Available <br /> Approximate circuit distance between the proposed PCC and the Miles <br /> substation: <br /> Distance to three phase circuit (if not already located on a three-phase Miles <br /> circuit): <br /> Limiting conductor ratings from the proposed PCC to the substation Amps <br /> Number of available phases on the area EPS at the proposed PCC Phases <br /> Is the proposed point of common coupling located on a spot network, ❑ Yes ❑ No <br /> grid network, or radial supply? <br /> Is the proposed PCC located behind a line voltage regulator? ❑ Yes ❑ No <br /> Type of voltage regulating devices between substation and proposed Device <br /> PCC A <br /> Device <br /> B <br /> Device <br /> C <br /> Number and type of protection devices between substation and Device <br /> proposed PCC A <br /> Device <br /> B <br /> Device <br /> C <br /> Any additionally known distribution system constraints? ❑ Yes ❑ No <br /> Additional known constraints that could affect installation or operation of the DER or Area EPS at the <br /> proposed PPC are attached to this report. Constraints may include, but are not limited to, electrical <br /> dependencies at that location, short circuit interrupting capacity issues, power quality or stability issues <br /> on the circuit, capacity constraints, or secondary networks. <br /> Utility Information <br /> Report Completed By: <br /> Company: <br /> Project Contact: <br /> Email: Phone: <br /> ELK RIVER MUNICIPAL UTILITIES 2 <br /> 223 <br />
The URL can be used to link to this page
Your browser does not support the video tag.