SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> Simplified Interconnection Application <br /> Persons interested in applying for the interconnection of a distributed energy resource (DER) to the <br /> Utility's distribution system through the Simplified Process are to fill out this Simplified Interconnection <br /> Application. The Simplified Interconnection Application is to be used for inverter-based DER <br /> technologies with the capacity of 20 kW AC or less and is to be filled out completely by the Applicant. <br /> The Simplified Application shall be returned to the Utility with the requested material information and a <br /> non-refundable $100 application fee. <br /> Proposed DER interconnections to the Utility's distribution submitted under the Simplified Process may <br /> be moved into the Fast Track Process if engineering screens are failed during the Simplified <br /> Interconnection Application review. Timeline for review of the Simplified Application is as follows: <br /> • Upon receipt of a Simplified Interconnection Application the Utility has 10 business days to <br /> review the application for completeness. <br /> • If the application is deemed incomplete, the Utility shall notify the Applicant of what additional <br /> information material is required. <br /> • The Applicant has 5 business days to return the missing information material or their application <br /> may lose its queue position and be deemed withdrawn. <br /> • The Utility shall have a total of 20 business days to review the Simplified Interconnection <br /> Application, not including time waiting for additional information material to deem the <br /> application completed. <br /> • The Utility will notify the Application if the proposed DER system is preliminary approved for <br /> interconnection or if the proposed DER system will need to be moved in the Fast Track Process. <br /> Checklist for Submission to Utility <br /> The items below shall be included with submittal of the Simplified Application to the Utility. Failure to <br /> include all items will deem the Simplified Application incomplete. <br /> Included <br /> $100 Non-Refundable Simplified Application Fee ❑ Yes <br /> One-line diagram—Details required on one-line diagram specified at the end of ❑ Yes <br /> the interconnection application. <br /> All Certified Equipment Manufacturer Specification Sheets ❑ Yes <br /> Site Layout Drawing ❑ Yes <br /> Copy of Insurance Declaration page or other acceptable proof of insurance ❑ Yes <br /> Possible Additional Documentation <br /> • If an Application Agent is being used for this project, the Site Layout Drawing must be signed <br /> by the Interconnection Customer indicating Site Control of the DER interconnection location. <br /> • If the DER export capacity is limited, include information material explaining the limiting <br /> capabilities. <br /> • If Energy Storage is included with the proposed DER system include the Energy Storage <br /> Application. <br /> ELK RIVER MUNICIPAL UTILITIES <br /> 224 <br />