My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> Pre-Application Report <br /> This report summarizes information available to the Utility regarding an interconnection of a distributed <br /> energy resource to the Utility's distribution system. The report includes only information that is readily <br /> available to the Utility. This report is not a guarantee by the Utility that a future interconnection <br /> application will be approved for the proposed site. Information provided in this report is subjected to <br /> change as modifications are made to the Utility's distribution system. <br /> Pre-Application Request <br /> Pre-Application ID: <br /> Project Address: <br /> DER Size: kW AC DER Type: <br /> Project Contact: <br /> Email: Phone: <br /> Electric Distribution System Information <br /> Info Not <br /> Available <br /> Total capacity of the circuit based on normal conditions likely to MW AC <br /> serve the proposed PCC <br /> Existing aggregate generation capacity interconnected to the MW AC <br /> circuit likely to serve the proposed PCC <br /> Aggregate queued generation capacity for the circuit likely to MW AC <br /> serve the proposed PCC <br /> Available capacity of the circuit most likely to serve the proposed MW AC <br /> PCC <br /> Estimated peak load of relevant line sections kW AC <br /> Estimated minimum load of relevant line sections (daytime kW AC <br /> minimum load to be specified for solar DER if available.) <br /> Substation Voltage (Nominal Distribution) kV <br /> Substation Voltage (Nominal Transmission) kV <br /> Nominal distribution circuit voltage at proposed PCC kV <br /> PCC: Point of Common Coupling <br /> ELK RIVER MUNICIPAL UTILITIES 1 <br /> 222 <br />