My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> 6 Timeline Extensions <br /> 6.1. Reasonable Efforts <br /> The Area EPS Operator shall make Reasonable Efforts to meet all time frames provided <br /> in these procedures. If the Area EPS Operator cannot meet a deadline provided herein, <br /> it must notify the Interconnection Customer in writing within three (3) Business Days <br /> after the deadline to explain the reason for the failure to meet the deadline and <br /> provide an estimated time by which it will complete the applicable interconnection <br /> procedure in the process. <br /> 6.2. Extensions <br /> For applicable time frames described in these procedures, the Interconnection <br /> Customer may request in writing one extension equivalent to half of the time originally <br /> allotted (e.g., ten (10) Business Days for a twenty (20) Business Days original time <br /> frame) which the Area EPS Operator may not unreasonably refuse. No further <br /> extensions for the applicable time frame shall be granted absent a Force Majeure Event <br /> or other similarly extraordinary circumstance. <br /> 7 Modifications to Application <br /> 7.1. Procedures <br /> At any time after the Interconnection Application is deemed complete, the <br /> Interconnection Customer or the Area EPS Operator may identify modifications to the <br /> proposed DER system that may improve costs and benefits (including reliability) of the <br /> proposed DER system and the ability for the Area EPS Operator to accommodate the <br /> proposed DER system. The Interconnection Customer shall submit to the Area EPS <br /> Operator in writing all proposed modifications to any information provided in the <br /> Interconnection Application. The Area EPS Operator cannot unilaterally modify the <br /> Interconnection Application. <br /> 7.2. Timelines <br /> Within ten (10) Business Days of receipt of the proposed modification, the Area EPS <br /> Operator shall evaluate whether the proposed modification to the Interconnection <br /> Application constitutes a Material Modification. The definition in Section 13 Glossary of <br /> the Process Overview document includes examples of what does and does not <br /> constitute a Material Modification. <br /> The Area EPS Operator shall notify the Interconnection Customer in writing of the final <br /> determination of the proposed modification. For proposed modifications that are <br /> 7 <br /> 173 <br />
The URL can be used to link to this page
Your browser does not support the video tag.