My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> Upon receipt of the signed Uniform Contract or MMIA, the Area EPS Operator may <br /> schedule appropriate metering replacements and construction of facilities, if necessary. <br /> 5 Insurance <br /> 5.1. Insurance Requirements <br /> At minimum, the Interconnection Customer shall maintain, for the duration the DER <br /> system is interconnected to the Area EPS Operator's Distribution System, $300,000 of <br /> general liability insurance from a qualified insurance agency with a B+ or better rating <br /> by "Best." Such general liability insurance shall include coverage against claims for <br /> damages resulting from (i) bodily injury, including wrongful death; and (ii) property <br /> damage arising out of the Interconnection Customer's ownership and/or operation of <br /> the DER under this agreement. Evidence of the insurance shall state that coverage <br /> provided is primary and is not excess to or contributing with any insurance or self- <br /> insurance by the Area EPS Operator. <br /> 5.2. Self-Insurance <br /> The Interconnection Customer may choose to be self-insured provided there is an <br /> established record of self-insurance. The Interconnection Customer shall supply the <br /> Area EPS Operator at least twenty (20) days prior to the date of initial operation, <br /> evidence of an acceptable plan to self-insure to a level of coverage equivalent to that <br /> required in Section 5.1. Failure of the Interconnection Customer or the Area EPS <br /> Operator to enforce the minimum levels of insurance does not relieve the <br /> Interconnection Customer from maintaining such levels of insurance or relieve the <br /> Interconnection Customer of any liability. <br /> 5.3. Proof of Insurance <br /> Prior to initial operation of the DER, the Interconnection Customer shall furnish the <br /> Area EPS Operator with the Declarations page of the Homeowner's insurance policy <br /> documenting insurance of the DER, if applicable or other insurance certificates and <br /> endorsements documenting insurance. Thereafter, the Area EPS Operator shall have <br /> the right to periodically inspect or obtain a copy of the original policy or polices of <br /> insurance. Additionally, the Area EPS Operator may request to be additionally listed as <br /> an interested third party on the insurance certificates and endorsements to meet the <br /> right to periodically obtain a copy of the policy or policies of insurance. <br /> 6 <br /> 172 <br />
The URL can be used to link to this page
Your browser does not support the video tag.