SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> determined to be a Material Modification the Interconnection Customer may choose to <br /> either: 1) withdraw the proposed modification; or 2) proceed with a new <br /> Interconnection Application. The Interconnection Customer shall provide its <br /> determination in writing to the Area EPS Operator within ten (10) Business Days after <br /> being provided the Material Modification determination. If the Interconnection <br /> Customer does not provide its determination within the timeline, the Interconnection <br /> Application shall be considered withdrawn. <br /> If the proposed modification is not determined to be a Material Modification, then the <br /> Area EPS Operator shall notify the Interconnection Customer in writing that the <br /> modification has been accepted and the Interconnection Customer shall retain its <br /> eligibility for interconnection, including its place in the queue. <br /> 8 Interconnection <br /> 8.1. Metering <br /> Any metering requirements necessitated by the use of the DER system shall be installed <br /> at the Interconnection Customer's expense. The metering requirement costs will be <br /> included in the final invoice of interconnection costs to the Interconnection Customer. <br /> The Interconnection Customer is also responsible for metering replacement costs not <br /> covered in the Interconnection Customer's general customer charge. The Area EPS <br /> Operator may charge Interconnection Customers an ongoing metering-related charge <br /> for an estimate of ongoing metering-related costs specifically demonstrated. <br /> 8.2. Construction <br /> The Interconnection Customer may proceed to construct (including operational testing <br /> not to exceed two hours) the DER system when the Area EPS Operator has approved <br /> the Simplified Interconnection Application. Upon receipt of a signed Uniform Contract <br /> or MMIA the Area EPS Operator shall schedule and execute appropriate construction of <br /> facilities, if necessary, which shall be completed prior to the Interconnection Customer <br /> returning the Certification of Completion.The Area EPS Operator will notify the <br /> Interconnection Customer when construction of the distribution facilities is completed. <br /> 8.3. Inspection, Testing and Commissioning <br /> Upon completing construction of the DER system, the Interconnection Customer will <br /> cause the DER system to be inspected or otherwise certified by the appropriate local <br /> electrical wiring inspector with jurisdiction. The Interconnection Customer shall then <br /> arrange for the inspection and testing of the DER system and the Customer's <br /> Interconnection Facilities prior to interconnection pursuant to Minnesota Technical <br /> Requirements. Commissioning test of the Interconnection Customer's installed <br /> 8 <br /> 174 <br />