My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-25-2000 PC MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Minutes
>
2000 - 2009
>
2000
>
04-25-2000 PC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:10 AM
Creation date
5/20/2005 2:49:47 PM
Metadata
Fields
Template:
City Government
type
PCM
date
4/25/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Planning Commission Minutes <br />April 25, 2000 <br />Page 5 <br /> <br />. <br /> <br />project is completed. Mr. Rohlf reviewed the conditions of approval that he <br />recommended be placed on the permit. <br /> <br />Discussion followed regarding language to prohibit the use of public streets by <br />the mining trucks. <br /> <br />Chair Mesich opened the public hearing. There being no comments from the <br />public, Chair Mesich closed the public hearing. <br /> <br />COMMISSIONER CHAMBERS MOVED TO RECOMMEND APPROVAL OF THE REQUEST <br />BY RYAN CONTRACTING CO., PUBLIC HEARING, CASE NO. CU 00-9, WITH THE <br />CONDITIONS AS STIPULATED IN THE STAFF REPORT UPDATE TO THE PLANNING <br />COMMISSION DATED 4/25/00, REGARDING: <br /> <br />. DURATION OF OPERATION <br />. HOURS OF OPERATION <br />. HAUL ROUTE <br />. OAK WILT <br />EROSION AND DUST CONTROL <br />. WORK WITHIN POWER LINE EASEMENT AND SETBACKS <br />. SLOPES <br />. GRAVEL TAX <br />. RECLAMATION AND LETTER OF CREDIT; <br /> <br />WITH AN AMENDMENT TO THE CONDITION REGARDING HAUL ROUTE, AS FOLLOWS: <br /> <br />. <br /> <br />VEHICLES FROM THE SITE DO NOT USE PUBLIC ROADS UNLESS APPROVED BY THE <br />CITY ENGINEER, EXCEPT THAT THEY MAY CROSS TYLER STREET. FURTHER, THAT THE <br />CROSSING OF TYLER STREET SHALL BE WITH ON-ROAD VEHICLES ONLY, ONCE THE <br />CURB FOR THAT ROAD HAS BEEN CONSTRUCTED. THE PARTICULARS OF THIS <br />STIPULATION SHALL BE COORDINATED BETWEEN THE CITY ENGINEER AND RYAN <br />CONTRACTING. <br /> <br />COMMISSIONER BAKER SECONDED THE MOTION. THE MOTION CARRIED 6-0. <br /> <br />5.4. Reauest bv Draasten ProDerties for Preliminary Plat tRolling Hills!. Public Hearinq <br />Case No. P 00-6 <br /> <br />staff report by Michele McPherson. Rod Dragsten of Dragsten Properties, is <br />requesting preliminary plat approval for a 30 lot cluster subdivision on 113.6 acres <br />located in the most northeasterly corner of the city limits. Ms. McPherson <br />explained that the lots are located adjacent to a central ring road and cul-de- <br />sac, with one road connecting to Jarvis Street. A connection is proposed from <br />the ring road to the north property line, should the property to the north develop. <br />The property consists of three 40-acre parcels. The 40 acre parcel to the west will <br />be set aside for open space, and is currently partially in sod production. The <br />subdivision will be located on Parcels A & B (80 acres total), with 28.36 acres of <br />this area set aside for open space, also. The applicant proposes to refurbish the <br />barn on Outlot A for use by the Association for storage of equipment. <br /> <br />. <br /> <br />Ms. McPherson reviewed the layout of the lots, lot sizes, access from Jarvis, <br />pedestrian trails, grading and drainage, utilities, landscaping, tree preservation, <br />
The URL can be used to link to this page
Your browser does not support the video tag.