My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1a ERMUSR 08-14-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
08-14-2018
>
6.1a ERMUSR 08-14-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2018 8:59:42 AM
Creation date
8/13/2018 8:59:29 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/14/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 9. Planning Approach <br /> This section outlines MMPA's planning approach. <br /> No Capacity Needed As discussed in Section 8, MMPA projects no capacity need until <br /> Until PY 2030 planning year 2030. <br /> Maintain Flexibility MMPA seeks to maintain flexibility in its power supply plan during <br /> in Time of a time of technological change. The rapid changes occurring with <br /> Technological renewable and storage technologies make flexibility vital to any <br /> Transition planning process. Securing additional capacity in the market allows <br /> MMPA to later reevaluate the changing market and capture <br /> opportunities that do not currently exist. <br /> Continue to MMPA will continue to reevaluate resource alternatives to <br /> Reevaluate determine what option is the most effective to meet future <br /> Feasibility of requirements. Included in these alternatives is the option to buy <br /> Resource capacity. MMPA maintains long term relationships with many <br /> Alternatives MISO market participants and looks for opportunities to buy <br /> capacity when cost effective. <br /> Committed to The Agency is committed to renewable energy. MMPA plans to <br /> Renewable Energy meet or exceed Minnesota's Renewable Energy Standard(RES). <br /> Section 12 further discusses MMPA's plan to meet renewable <br /> requirements. <br /> 105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.