My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1a ERMUSR 08-14-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
08-14-2018
>
6.1a ERMUSR 08-14-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2018 8:59:42 AM
Creation date
8/13/2018 8:59:29 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/14/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 8. Additional Capacity Requirements <br /> This section describes MMPA's projected additional capacity <br /> requirements over this IRP's planning period. <br /> No Capacity MMPA projects that it will not need new capacity until planning <br /> Needed Until 2030 year 2030. The chart below shows MMPA's projected capacity <br /> position by year during the projection period. <br /> Minnesota Municipal Power Agency <br /> Projected Capacity Position <br /> 2019-2033 <br /> 40 22 <br /> 21 12 13 14 16 18 20 16 18 20 <br /> 20 <br /> (20) <br /> (40) <br /> (60) <br /> ;6)(S9) 92 <br /> (80) Projected Excess(Deficit) ( )(95) <br /> (100) <br /> (120) <br /> e e &.\ O��r Otis O^� O�� O�� O�� O�� O^r� O�� O�� O�� O�� <br /> `L ^r 'L ti ^✓ ti ti ^✓ � �r ^v ti ^✓ 'L 'fir <br /> Planning Year <br /> Projected Capacity MMPA projects that its first year of capacity need is PY 2030 for 86 <br /> Need Grows From 86 MW. The expiration of a capacity contract and member load growth <br /> MW in 2030 To 95 are the main reasons for the capacity need. <br /> MW in 2033 <br /> Planning Reserve MMPA currently participates in the MISO PRM pool. This IRP <br /> Margin Requirement assumes a PRM of 8.4%for the projection period, as discussed in <br /> of 8.4% Is Assumed previous sections. <br /> Transmission Losses Transmission losses of 2.3% are assumed for this IRP, as discussed <br /> Assumed to Be 2.3% in previous sections. <br /> 104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.