Laserfiche WebLink
Buffalo Solar The Buffalo Solar Facility(BSF), a 7.1 MW AC utility-scale solar <br /> Projected UCAP: 3.6 facility located in the Agency's member community of Buffalo, entered <br /> MW commercial operation at the end of 2017. MMPA signed a 22.5-year, <br /> long-turn contract with HQC Tatanka Wi Solar Power Generation <br /> LLC, for the output of the solar facility. <br /> BSF <br /> 2018 2019-2033 <br /> ICAP 7.1 7.1 <br /> Capacity Credit 50.00% 50.00% <br /> UCAP/ZRC 3.6 3.6 <br /> MMPA Purchased MMPA has purchased between 65 and 105 MW of MISO Zonal <br /> Capacity for PY 2019- Resource Credits (ZRCs)for 2019 through 2029. <br /> 2029 <br /> Minnesota Municipal Power Agency <br /> Capacity Purchases (ZRCs) <br /> 2019-2029 <br /> 120 <br /> 100 <br /> so <br /> i <br /> 60 <br /> 40 <br /> 20 <br /> 0 <br /> 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 <br /> Planning Year <br /> 103 <br />