My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1a ERMUSR 08-14-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
08-14-2018
>
6.1a ERMUSR 08-14-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2018 8:59:42 AM
Creation date
8/13/2018 8:59:29 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/14/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HTBE Projected Hometown BioEnergy(HTBE) is an 8 MW biomass facility, located in <br /> UCAP: 7.2 MW the MMPA member community of Le Sueur. It provides dispatchable, <br /> on-peak renewable energy to the Agency. <br /> Hometown BioEnergy supports the local community by collecting and <br /> processing local wastes to create a renewable source of electricity that <br /> flows directly into the Le Sueur power system. <br /> The facility was recognized by POWER Magazine as a 2014 Top <br /> Renewable Plant. <br /> HTBE ICAP for PY 2019 is projected to be 8 MW. The EFORd used to <br /> calculate HTBE's 2019 UCAP is 10.42%,which is the class average <br /> for diesel generation in MISO in 2018. This IRP assumes that HTBE's <br /> EFORd will match the 2018 class average for diesel generation for the <br /> IRP period through 2033. <br /> HTBE <br /> 2019-2033 <br /> ICAP 8 <br /> EFORd 10.42% <br /> UCAP/ZRC 7.2 <br /> OGWF Projected The 44 MW Oak Glen Wind Farm (OGWF) is MMPA's first owned <br /> UCAP: 7.6 MW wind farm and is located near Blooming Prairie, Minnesota. <br /> The U.S. Department of Energy awarded OGWF with the "2012 Public <br /> Power Wind Award"for leadership, innovation, project creativity, and <br /> benefits to customers. OGWF's innovative ownership and financial <br /> structure qualified the wind project to receive a$25.4 million federal <br /> grant. <br /> OGWF ICAP for PY 2018 is 44 MW. For wind resources, MISO uses <br /> capacity credit instead of EFORd. The UCAP is simply calculated by <br /> multiplying the ICAP by the capacity credit. The capacity credit used to <br /> calculate OGWF's 2018 UCAP is 17.35%. This IRP assumes that <br /> OGWF will continue to receive the 2018 capacity credit for the 15-year <br /> planning horizon. <br /> OGWF <br /> 2018 2019-2033 <br /> ICAP 44 44 <br /> Capacity Credit 17.35% 17.35% <br /> UCAP/ZRC 7.6 7.6 <br /> 102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.