Laserfiche WebLink
SEP <br /> 2018 2019-2033 <br /> ICAP 46.4 46.4 <br /> EFORd 8.19% 8.19% <br /> UCAP/ZRC 42.6 42.6 <br /> MRS Projected The Minnesota River Station (MRS)plant is a peaking resource. The <br /> UCAP: 35.6 MW City of Chaska, one of the Agency's members, owns the plant and sells <br /> the entire output to MMPA under a long-term contract. MRS became <br /> operational in the summer of 2001 and is accredited for approximately <br /> 40 MW in the summer. Minnesota River Station uses natural gas as its <br /> primary fuel. <br /> MRS's ICAP for PY 2018 is 39.6 MW. The EFORd used to calculate <br /> MRS' 2018 UCAP is 10.00%. This IRP assumes that MRS's EFORd <br /> will continue to be 10.00% for the 15-year planning horizon of 2019- <br /> 2033. <br /> MRS <br /> 2018 2019-2033 <br /> ICAP 39.6 39.6 <br /> EFORd 10.00% 10.00% <br /> UCAP/ZRC 35.6 35.6 <br /> BOGF Projected At the end of 2016, the Minnesota Municipal Power Agency(MMPA) <br /> UCAP: 9.7 MW expanded its portfolio of renewable resources to include power from <br /> the 78-megawatt(MW)Black Oak Getty Wind Farm (BOGF) located <br /> in Stearns County, Minnesota. <br /> MMPA signed a long-term contract with Sempra U.S. Gas & Power for <br /> the output of the Black Oak Getty Wind Farm. The wind farm, <br /> composed of 39 wind turbines, entered commercial operation in <br /> December 2016. The term of the contract is 30 years. <br /> BOGF ICAP for PY 2018 is 78 MW. For wind resources, MISO uses <br /> capacity credit instead of EFORd. The UCAP is simply calculated by <br /> multiplying the ICAP by the capacity credit. The capacity credit used to <br /> calculate BOGF's 2018 UCAP is 12.44%. This IRP assumes that <br /> BOGF will continue to receive the 2018 capacity credit for the 15-year <br /> planning horizon. <br /> BOGF <br /> 2018 2019-2033 <br /> ICAP 78 78 <br /> Capacity Credit 12.44% 12.44% <br /> UCAP/ZRC 9.7 9.7 <br /> 101 <br />