MISO Capacity MISO capacity is measured by Unforced Capacity(UCAP). UCAP is <br /> Measured by calculated by multiplying the Installed Capacity(ICAP) of a generating <br /> Unforced Capacity resource by 1 minus the Effective Forced Outage Rate (EFORd). Once <br /> (UCAP) the UCAP of a resource is calculated, market participants can convert <br /> UCAP to Zonal Resource Credits (ZRCs)to get capacity. <br /> FEP Projected UCAP: Faribault Energy Park(FEP) is the first power supply resource financed <br /> 257.3 MW and built by MMPA. The plant was built in two phases, with simple <br /> cycle operation beginning in April 2005. The combined cycle phase <br /> began operations in the summer of 2007, improving the fuel efficiency <br /> and increasing the maximum accredited summer output of the plant to <br /> 261 MW. The plant uses natural gas as its primary fuel. <br /> FEP is an innovative power plant that uses a series of created wetlands <br /> for water management at the plant. Rainwater is collected and filtered <br /> before being used for steam production and equipment cooling. The <br /> wetlands area is open to the public as a park with several small trails. <br /> The plant is also designed to be a"working classroom," with an <br /> observation room where visitors can view both the steam turbine and <br /> the plant's control room. <br /> FEP's ICAP for PY 2018 is 261.3 MW. The EFORd used to calculate <br /> FEP's 2018 UCAP is 1.53%. This IRP assumes that FEP's EFORd <br /> will continue to be 1.53%for the 15-year planning horizon of 2019- <br /> 2033. <br /> FEP <br /> 2018 2019-2033 <br /> ICAP 261.3 261.3 <br /> EFORd 1.53% 1.53% <br /> UCAP/ZRC 257.3 257.3 <br /> SEP Projected UCAP: Shakopee Energy Park (SEP) is a 46.4 MW distributed energy <br /> 42.6 MW resource. Located in Shakopee near Canterbury Park, SEP uses fuel- <br /> efficient reciprocating engines to generate local, reliable power for the <br /> City of Shakopee as well as contributing to the overall power supply <br /> for all MMPA member communities. <br /> SEP's ICAP for PY 2018 is 46.4 MW. The EFORd used to calculate <br /> SEP's 2018 UCAP is 8.19%. This IRP assumes that SEP's EFORd <br /> will continue to be 8.19%for the 15-year planning horizon of 2019- <br /> 2033. <br /> 100 <br />